Purchasing an accident insurance policy would be an example of responding to a risk by ________ it.

Answer

Correct Answer: Transferring

Note: This Question is unanswered, help us to find answer for this one

Project management is gaining in importance for all types of projects because of _________.

Answer

Correct Answer: Technology complexity, tighter budgets, tougher competition, and shorter time-

Note: This Question is unanswered, help us to find answer for this one

Project _____ management consists of preparing and managing the budget for a project.

Answer

Correct Answer: Cost

Note: This Question is unanswered, help us to find answer for this one

Procedures for administrative and contract closure are examples of organizational ____ assets.

Answer

Correct Answer: Process

Note: This Question is unanswered, help us to find answer for this one

Problems with timetables and project milestones can indicate ____.

Answer

Correct Answer: Personality conflicts

Note: This Question is unanswered, help us to find answer for this one

In the _______________, the organization actually starts to execute the project plan.

Answer

Correct Answer: Performance Phase

Note: This Question is unanswered, help us to find answer for this one

_______ are important because they ensure a realistic solution to your problem.

Answer

Correct Answer: Constraints

Note: This Question is unanswered, help us to find answer for this one

Fast tracking is an example of a tool used in _____ management.

Answer

Correct Answer: Time

Note: This Question is unanswered, help us to find answer for this one

The first step in the creation of a pert/cpm chart is to ____.

Answer

Correct Answer: Identify all the project tasks

Note: This Question is unanswered, help us to find answer for this one

A document that states the principles of quality would be a quality _____.

Answer

Correct Answer: Policy

Note: This Question is unanswered, help us to find answer for this one

In a project schedule, the variable that has the least amount of flexibility is _____.

Answer

Correct Answer: Time

Note: This Question is unanswered, help us to find answer for this one

The _____ should list and describe all of the deliverables required for the project.

Answer

Correct Answer: Scope statement

Note: This Question is unanswered, help us to find answer for this one

Performing quality assurance is a subprocess of the _____ process of project quality management.

Answer

Correct Answer: Executing

Note: This Question is unanswered, help us to find answer for this one

A ____ is a time-phased budget that project managers use to measure and monitor cost performance.

Answer

Correct Answer: Budget baseline

Note: This Question is unanswered, help us to find answer for this one

Cbt or wbt for those preparing for certification exams are ____ courses.

Answer

Correct Answer: Online tutorial

Note: This Question is unanswered, help us to find answer for this one

Each task in a systems development project should culminate in one or more ________.

Answer

Correct Answer: Deliverables

Note: This Question is unanswered, help us to find answer for this one

____ is an independent test performed by end users prior to accepting the delivered system.

Answer

Correct Answer: User acceptance testing.

Note: This Question is unanswered, help us to find answer for this one

A ________ defines the boundaries of a system in a work breakdown structure (wbs).

Answer

Correct Answer: Scope

Note: This Question is unanswered, help us to find answer for this one

Scope ______ is often achieved by a customer inspection and then sign-off on key deliverables.

Answer

Correct Answer: Verification

Note: This Question is unanswered, help us to find answer for this one

The _____ line for any e-mail messages you write should clearly state the intention of the e-mail.

Answer

Correct Answer: Subject

Note: This Question is unanswered, help us to find answer for this one

_____ is the product of a risk event probability and the risk events monetary value.

Answer

Correct Answer: Estimated monetary value (EMV)

Note: This Question is unanswered, help us to find answer for this one

A _____ cannot be started until a previous task is completed.

Answer

Correct Answer: Predecessor task

Note: This Question is unanswered, help us to find answer for this one

In project procurement management, an output of the _____ monitoring and controlling process.

Answer

Correct Answer: Change requests.

Note: This Question is unanswered, help us to find answer for this one

Complete the formula: sample size = 0.25 * ( _____ /acceptable error)2

Answer

Correct Answer: Certainty factor

Note: This Question is unanswered, help us to find answer for this one

__________ of lessons learned are designed to improve performance on current and future projects.

Answer

Correct Answer: Retrospectives

Note: This Question is unanswered, help us to find answer for this one

_____ refers to matching certain behaviors of the other person.

Answer

Correct Answer: Mirroring

Note: This Question is unanswered, help us to find answer for this one

_____ involves building individual and group skills to enhance project performance.

Answer

Correct Answer: Developing the project team

Note: This Question is unanswered, help us to find answer for this one

_____ is a method for determining the estimated annual costs and benefits for a project.

Answer

Correct Answer: Critical path analysis

Note: This Question is unanswered, help us to find answer for this one

_____ involve ranking or assigning importance to things, such as projects, goals, and tasks.

Answer

Correct Answer: Archetypes

Note: This Question is unanswered, help us to find answer for this one

__________ causes a person to lapse abruptly into rem sleep from the awake state.

Answer

Correct Answer: Narcolepsy

Note: This Question is unanswered, help us to find answer for this one

A _____ person achieves a balance between risk and payoff.

Answer

Correct Answer: Risk-seeking

Note: This Question is unanswered, help us to find answer for this one

The objective of ____ is to restore service as quickly as possible.

Answer

Correct Answer: Incident management

Note: This Question is unanswered, help us to find answer for this one

A fully developed "mini" version of the report is referred to as a(n) _________________.

Answer

Correct Answer: Executive summary

Note: This Question is unanswered, help us to find answer for this one

A _____ is a standard of measurement in quality management.

Answer

Correct Answer: Metric.

Note: This Question is unanswered, help us to find answer for this one

A _____ consists of horizontal bars, connected with arrows that indicate task dependencies.

Answer

Correct Answer: Scatter chart

Note: This Question is unanswered, help us to find answer for this one

A comprehensive test plan should ________.

Answer

Correct Answer: Cause every line of program code to be executed

Note: This Question is unanswered, help us to find answer for this one

A company that contracts with another organization that specializes in user support is using ____.

Answer

Correct Answer: Outsourcing

Note: This Question is unanswered, help us to find answer for this one

The shortest possible time an activity can be completed realistically is called ________ time.

Answer

Correct Answer: Crash.

Note: This Question is unanswered, help us to find answer for this one

A pump jack scaffold must be fitted with two ______ gripping mechanisms to prevent slippage.

Answer

Correct Answer: Positive

Note: This Question is unanswered, help us to find answer for this one

_____ project work includes collecting, measuring, and disseminating performance information.

Answer

Correct Answer: Monitoring

Note: This Question is unanswered, help us to find answer for this one

The _____ acts as the point person for the facility in managing each game or show.

Answer

Correct Answer: Event director

Note: This Question is unanswered, help us to find answer for this one

A(n) _____ is a framework for describing the phases involved in developing information systems.

Answer

Correct Answer: SDLC

Note: This Question is unanswered, help us to find answer for this one

All meetings must have a(n) _____ and intended outcome.

Answer

Correct Answer: Purpose

Note: This Question is unanswered, help us to find answer for this one

To ensure that plans are moving in the right direction, managers can use the ______.

Answer

Correct Answer: Planning/control cycle

Note: This Question is unanswered, help us to find answer for this one

A draft schedule for a project is most likely to be found in a _____.

Answer

Correct Answer: Project charter

Note: This Question is unanswered, help us to find answer for this one

The main tool for performing scope verification is ____.

Answer

Correct Answer: Inspection

Note: This Question is unanswered, help us to find answer for this one

Industry standard tools for scheduling and project management include pert, wbs, and ________.

Answer

Correct Answer: Gantt charts

Note: This Question is unanswered, help us to find answer for this one

As the number of people involved in a project _____, the complexity of communications _____.

Answer

Correct Answer: Increases, increases

Note: This Question is unanswered, help us to find answer for this one

An example of push communication is _____.

Answer

Correct Answer: Voice mails

Note: This Question is unanswered, help us to find answer for this one

A(n) _____ is a document that contains results of various risk management processes.

Answer

Correct Answer: Risk register

Note: This Question is unanswered, help us to find answer for this one

A(n) _____ documents the procedures for managing risk throughout the project.

Answer

Correct Answer: Risk management plan

Note: This Question is unanswered, help us to find answer for this one

A task that represents several activities is known as a _____.

Answer

Correct Answer: Task group.

Note: This Question is unanswered, help us to find answer for this one

_____ helps develop an accurate projection of a project's financial expenses and benefits.

Answer

Correct Answer: Life cycle costing

Note: This Question is unanswered, help us to find answer for this one

A network diagramming technique in which boxes represent activities is known as a(n) _____.

Answer

Correct Answer: PDM

Note: This Question is unanswered, help us to find answer for this one

Project managers have the least amount of authority in a pure _____ organizational structure.

Answer

Correct Answer: Functional

Note: This Question is unanswered, help us to find answer for this one

Behavior and skill-based outcomes are best measured by _____.

Answer

Correct Answer: Observations

Note: This Question is unanswered, help us to find answer for this one

All of the following except ________ can promote ethical choices across cultures.

Answer

Correct Answer: Capturing the moral high ground

Note: This Question is unanswered, help us to find answer for this one

______ is the latest possible date an activity may begin without delaying the project completion.

Answer

Correct Answer: Late start time

Note: This Question is unanswered, help us to find answer for this one

_______ is free software for small businesses with relatively less complex projects.

Answer

Correct Answer: Open source software

Note: This Question is unanswered, help us to find answer for this one

Incorrect activity scheduling, poor forecasting, and poor supplier selection best describe _______.

Answer

Correct Answer: Operational risks

Note: This Question is unanswered, help us to find answer for this one

Unrealistic activity time estimates and insufficient resources best describe _______.

Answer

Correct Answer: Schedule risks

Note: This Question is unanswered, help us to find answer for this one

_______ are risks outside of the company’s control.

Answer

Correct Answer: External risks

Note: This Question is unanswered, help us to find answer for this one

_______ is/are actions taken to reduce project risks.

Answer

Correct Answer: Risk mitigation

Note: This Question is unanswered, help us to find answer for this one

This risk is mostly within the company’s control and can be caused by design changes:

Answer

Correct Answer: Cost risks

Note: This Question is unanswered, help us to find answer for this one

“Unexpected events that can cause missed completion times” best describes _______.

Answer

Correct Answer: Project risks

Note: This Question is unanswered, help us to find answer for this one

_______ is the best estimate of completion time for an activity, given normal conditions.

Answer

Correct Answer: Most likely completion time

Note: This Question is unanswered, help us to find answer for this one

_______ is reducing a project’s completion time by using more resources.

Answer

Correct Answer: Project crashing

Note: This Question is unanswered, help us to find answer for this one

The _______ is the time to complete the activity if everything goes according to plan.

Answer

Correct Answer: Optimistic completion time

Note: This Question is unanswered, help us to find answer for this one

_______ is the shortest possible time for activity completion.

Answer

Correct Answer: Crash time

Note: This Question is unanswered, help us to find answer for this one

The _______ is the longest sequence of activities, which determine the project completion time.

Answer

Correct Answer: Critical path

Note: This Question is unanswered, help us to find answer for this one

_______ shows the time lengths and sequences of a project’s task activities.

Answer

Correct Answer: A Gantt chart

Note: This Question is unanswered, help us to find answer for this one

_______ has all of the independent tasks defined as much as possible.

Answer

Correct Answer: A work breakdown structure

Note: This Question is unanswered, help us to find answer for this one

_______ has a defined beginning and end, with specific tasks, objectives, and assigned resources.

Answer

Correct Answer: A project

Note: This Question is unanswered, help us to find answer for this one

________ is the project’s independent tasks, defined as much as possible.

Answer

Correct Answer: Work Breakdown Structure

Note: This Question is unanswered, help us to find answer for this one

Technology risks failures or breakdowns of technology and software, and software integration problems, which can delay projects.

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

The difference between the early start and late start times or the early finish and late finish times is known as ______ .

Answer

Correct Answer: Slack Time

Note: This Question is unanswered, help us to find answer for this one

Schedule Risks are unrealistic activity time estimates _______ which cause project delays.

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

Actions taken to reduce project risk is known as _____ .

Answer

Correct Answer: Risk Mitigation Plans

Note: This Question is unanswered, help us to find answer for this one

Project risk can caused missed project completion times or cost overruns

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Software designed to track a project’s progress is known as ______.

Answer

Correct Answer: Project Management Software,

Note: This Question is unanswered, help us to find answer for this one

Project crashing reduces a project’s completion time by using more resources .

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Project is a temporary group activity designed to produce a ______ or result .

Answer

Correct Answer: Both a & b

Note: This Question is unanswered, help us to find answer for this one

Which method developed in the 1950s to determine a project’s longest sequence of activities ?

Answer

Correct Answer: Both a & b

Note: This Question is unanswered, help us to find answer for this one

Probability of Completing a Project by a Given Time Use the standard normal equation to find Z .

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Pessimistic Completion Time is the _______ time for an activity, given that everything goes wrong.

Answer

Correct Answer: Maximum completion

Note: This Question is unanswered, help us to find answer for this one

Optimistic Completion Time is the time to complete the activity if everything goes according to plan.

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Operational Risks Incorrect activity scheduling _______ lack of communication among key personnel.

Answer

Correct Answer: Both a & b

Note: This Question is unanswered, help us to find answer for this one

Free software for small businesses with relatively less complex projects is known as _____ .

Answer

Correct Answer: Open Source Software

Note: This Question is unanswered, help us to find answer for this one

The best estimate of completion time for an activity, given normal conditions is known as _____ .

Answer

Correct Answer: Most Likely Completion Time

Note: This Question is unanswered, help us to find answer for this one

Managing Projects is the _______ of resources to meet the specific goals .

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

Gantt Chart shows the _____ and sequences of a project’s task activities

Answer

Correct Answer: Time lengths

Note: This Question is unanswered, help us to find answer for this one

Risks outside of company control, which can cause project delays is known as _____ .

Answer

Correct Answer: External Risks

Note: This Question is unanswered, help us to find answer for this one

Expected Activity Completion Time is the _______ weights are used with the three time estimates.

Answer

Correct Answer: Beta distribution

Note: This Question is unanswered, help us to find answer for this one

Critical Path Method is a method developed in the ______ to determine a project’s longest sequence of activities.

Answer

Correct Answer: 1950s

Note: This Question is unanswered, help us to find answer for this one

Critical Path is the ______ of activities that, when linked together, determine the completion time for the entire project

Answer

Correct Answer: Longest sequence

Note: This Question is unanswered, help us to find answer for this one

Critical Activity is activities on the critical path.

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Crash Time is the _____ possible time for activity completion

Answer

Correct Answer: Shortest

Note: This Question is unanswered, help us to find answer for this one

Crash Cost is the cost to achieve the crash time.

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Risks that are mostly within company control, such as cost overruns by suppliers and subcontractors is known as _____ .

Answer

Correct Answer: Cost Risks

Note: This Question is unanswered, help us to find answer for this one

Cloud Computing access and delivery of information technology resources including ______ on an as-needed basis.

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

Project management software available in the cloud.This statement is related to _____ .

Answer

Correct Answer: Cloud-Based Project Management Solution

Note: This Question is unanswered, help us to find answer for this one

σ2A = [(b - a) / 6]2 equation is used for the variance of ______ .

Answer

Correct Answer: Activity Completion Time Variance

Note: This Question is unanswered, help us to find answer for this one

The ______ should include all costs relevant to the project, the most important of which are personnel costs, equipment and materials, and the project overhead.

Answer

Correct Answer: Planned value

Note: This Question is unanswered, help us to find answer for this one

Which of the following refers to the real budgeted cost, or “value,” of the work actually performed to date?

Answer

Correct Answer: Earned value

Note: This Question is unanswered, help us to find answer for this one

The critical path is ______ path in the project.

Answer

Correct Answer: Longest

Note: This Question is unanswered, help us to find answer for this one

______ is a budget that identifies the correct sequencing of tasks and the points in the project when budgeted money is likely to be spent as those tasks are completed.

Answer

Correct Answer: Time-phased budget

Note: This Question is unanswered, help us to find answer for this one

The ______ identifies each of the project’s activities and human or material resources assigned to it.

Answer

Correct Answer: Work breakdown structure

Note: This Question is unanswered, help us to find answer for this one

______ allows us to identify the correct sequencing of tasks, but more importantly, it enables the project team to determine the points in the project when budgeted money is likely to be spent as those tasks are completed.

Answer

Correct Answer: Time-phased budget

Note: This Question is unanswered, help us to find answer for this one

Which of the following refers to the earned value to date divided by the planned value of work scheduled to be performed?

Answer

Correct Answer: Schedule performance index

Note: This Question is unanswered, help us to find answer for this one

______ is the cost estimate of the budgeted resources scheduled across the project’s life cycle.

Answer

Correct Answer: Planned value

Note: This Question is unanswered, help us to find answer for this one

Which of the following refers to the earned value divided by the actual, cumulative cost of the work performed to date?

Answer

Correct Answer: Cost performance index

Note: This Question is unanswered, help us to find answer for this one

______ method is valuable because it allows us to see how a project is truly performing.

Answer

Correct Answer: Earned value management

Note: This Question is unanswered, help us to find answer for this one

______ is sometimes referred to as the level of effort.

Answer

Correct Answer: Planned value

Note: This Question is unanswered, help us to find answer for this one

Which of the following refers to the cumulative total cost of completing the project’s work packages?

Answer

Correct Answer: Actual cost of work performed

Note: This Question is unanswered, help us to find answer for this one

______ are probabilistic estimates based on optimistic, most likely, and pessimistic times for each activity.

Answer

Correct Answer: PERT estimates

Note: This Question is unanswered, help us to find answer for this one

______ is calculated by the difference between the earned value to date minus the planned value of the work scheduled to be performed to date.

Answer

Correct Answer: Schedule variance

Note: This Question is unanswered, help us to find answer for this one

______ is the earned value minus the actual cost of work performed.

Answer

Correct Answer: Cost variance

Note: This Question is unanswered, help us to find answer for this one

______ is the latest possible date an activity can be completed without delaying the project’s completion.

Answer

Correct Answer: Late finish time

Note: This Question is unanswered, help us to find answer for this one

______ is the process of creating a chart that shows a project’s activities and indicates how they should logically be coordinated with one another.

Answer

Correct Answer: Network diagramming

Note: This Question is unanswered, help us to find answer for this one

______ works best when you can be reasonably certain of how long the project’s activities are likely to take.

Answer

Correct Answer: Critical path method

Note: This Question is unanswered, help us to find answer for this one

______ is the manufacturing or assembling of materials to create the product or service.

Answer

Correct Answer: Fabrication

Note: This Question is unanswered, help us to find answer for this one

What process is performed to determine a projects critical path and total slack time for each activity?

Answer

Correct Answer: Backward pass

Note: This Question is unanswered, help us to find answer for this one

The triple constraint of projects is ______.

Answer

Correct Answer: Time, cost, and quality

Note: This Question is unanswered, help us to find answer for this one

The ______ method calculates the value generated by the project as well as the budgeted and actual costs at a certain point in time.

Answer

Correct Answer: Earned value management

Note: This Question is unanswered, help us to find answer for this one

In the ______ stage, the team members decide what they expect to achieve with the project.

Answer

Correct Answer: Conceptualization

Note: This Question is unanswered, help us to find answer for this one

The four stages of the project life cycle are ______.

Answer

Correct Answer: Conceptualization, planning, execution, and termination

Note: This Question is unanswered, help us to find answer for this one

The most common type of activity network employs ______ network representation

Answer

Correct Answer: Activity on node

Note: This Question is unanswered, help us to find answer for this one

A ______ is a unique venture with a beginning and end, conducted by people to meet established goals within certain cost, schedule, and quality parameters.

Answer

Correct Answer: Project

Note: This Question is unanswered, help us to find answer for this one

______ chart links project activities to a schedule, which is usually a calendar.

Answer

Correct Answer: Gantt

Note: This Question is unanswered, help us to find answer for this one

Two of the best known methods for tracking projects upon their execution are ______.

Answer

Correct Answer: S-curves and earned value management

Note: This Question is unanswered, help us to find answer for this one

______ is the process of speeding up a project’s remaining activities in order to move its completion date forward.

Answer

Correct Answer: Crashing

Note: This Question is unanswered, help us to find answer for this one

A budget that identifies the correct sequencing of tasks and the points in the project when budgeted money is likely to be spent as those tasks are completed IS Known as

Answer

Correct Answer: Time-Phased Budget

Note: This Question is unanswered, help us to find answer for this one

In the schedule performance Index the earned value to date divided by the _______ of work scheduled to be performed (EV/PV). This value allows us to calculate the project’s schedule to completion

Answer

Correct Answer: PV

Note: This Question is unanswered, help us to find answer for this one

Abbreviation of Pv is

Answer

Correct Answer: Planned Value

Note: This Question is unanswered, help us to find answer for this one

Earned Value is the real budgeted cost, or “value,” of the work actually performed to date.

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Define Cost Performance Index

Answer

Correct Answer: EV/AC

Note: This Question is unanswered, help us to find answer for this one

The total budget for a project at its completion.this statement is true for

Answer

Correct Answer: Actual Cost of Work Performed

Note: This Question is unanswered, help us to find answer for this one

The cumulative total cost of completing the project’s work packages is known as

Answer

Correct Answer: Actual Cost of Work Performed

Note: This Question is unanswered, help us to find answer for this one

activities that comprise the deliverables of a project is known as

Answer

Correct Answer: Work Packages

Note: This Question is unanswered, help us to find answer for this one

WBS s stands for

Answer

Correct Answer: Work Breakdown Structure

Note: This Question is unanswered, help us to find answer for this one

Triple Constraint elements that characterize a project and are used to _______ its success: time (adherence to schedule), cost, and quality

Answer

Correct Answer: Evaluate

Note: This Question is unanswered, help us to find answer for this one

S-curve is typical shape of a project’s status graphically Plotted against_______

Answer

Correct Answer: Time

Note: This Question is unanswered, help us to find answer for this one

Scope Management determining the best way in which the project’s goals can be accomplished given its constraints

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Scope Creep is a situation in which project specifications are continually modified or improved as ________ or new technical solutions become possible

Answer

Correct Answer: New ideas emerge

Note: This Question is unanswered, help us to find answer for this one

_______ is the process of anticipating and figuring out how to respond to a project’s risks prior to beginning the project

Answer

Correct Answer: Risk Management

Note: This Question is unanswered, help us to find answer for this one

The process of converting a project’s goals into a logical method for completing them on time is known as

Answer

Correct Answer: Project Scheduling

Note: This Question is unanswered, help us to find answer for this one

Formula 0f Project Risk

Answer

Correct Answer: Project Risk = (Probability of Event) × (Consequences of Event)

Note: This Question is unanswered, help us to find answer for this one

The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements is known as

Answer

Correct Answer: Project Management

Note: This Question is unanswered, help us to find answer for this one

“PERT” is Stands for

Answer

Correct Answer: Program Evaluation Review Technique

Note: This Question is unanswered, help us to find answer for this one

A duration estimation that assigns probabilities to a range of time estimates for each activity is known as

Answer

Correct Answer: Probabilistic Estimation

Note: This Question is unanswered, help us to find answer for this one

Precedence Diagramming is also known as

Answer

Correct Answer: Network diagramming

Note: This Question is unanswered, help us to find answer for this one

Define life cycle.

Answer

Correct Answer: The stages of a project’s development: conceptualization, planning, execution, and termination

Note: This Question is unanswered, help us to find answer for this one

the latest possible date that an activity may begin without delaying the project completion is known as

Answer

Correct Answer: Late Start Time

Note: This Question is unanswered, help us to find answer for this one

Late Finish Time the latest possible date an activity can be ______ the project’s completion

Answer

Correct Answer: Completed without delaying

Note: This Question is unanswered, help us to find answer for this one

A diagram that links project activities to a schedule, usually a calendar

Answer

Correct Answer: Gantt Chart

Note: This Question is unanswered, help us to find answer for this one

Forward Pass is the process of fully labeling the activity nodes in a network to determine the earliest times each activity can begin and the earliest it can be completed

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

Which method is used to calculate the value generated by the project as well as the budgeted

Answer

Correct Answer: Earned Value Management

Note: This Question is unanswered, help us to find answer for this one

Early Start Time The earliest possible date on which an activity can start, based on the _______ times for previous activities in the network

Answer

Correct Answer: Beginning and ending

Note: This Question is unanswered, help us to find answer for this one

EF is Stands for (Operation Management)

Answer

Correct Answer: Early Finish Time

Note: This Question is unanswered, help us to find answer for this one

A duration estimation that assumes that sufficient information from historical records or the opinion of experts is available to make this determination with a reasonable degree of accuracy is known as

Answer

Correct Answer: Deterministic Estimation

Note: This Question is unanswered, help us to find answer for this one

Critical Path the sequence of activities in a network that defines the overall length of the project

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

________ is the process which speeding up a project’s remaining activities to move its completion date forward

Answer

Correct Answer: Crashing

Note: This Question is unanswered, help us to find answer for this one

The process of labeling the activity nodes in a network to determine the project’s critical path and the total slack time for each activity is known as

Answer

Correct Answer: Backward Pass

Note: This Question is unanswered, help us to find answer for this one

_________ and the path arrows to represent the sequencing of tasks from node to node through the network

Answer

Correct Answer: Individual project activity

Note: This Question is unanswered, help us to find answer for this one

AOA is stands for

Answer

Correct Answer: Activity on Arrow

Note: This Question is unanswered, help us to find answer for this one

A diagram that illustrates how activities should best be sequenced is known as

Answer

Correct Answer: Activity Network

Note: This Question is unanswered, help us to find answer for this one