80. _____ involves doing whatever you can to make sure the positive risk happens.
Answer
Correct Answer:
Risk exploitation
Note: This Question is unanswered, help us to find answer for this one
81. _____ involves deciding how to approach and plan the risk management activities for the project.
Answer
Correct Answer:
Planning risk management
Note: This Question is unanswered, help us to find answer for this one
82. _____ involves allocating ownership of the risk to another party.
Answer
Correct Answer:
Risk sharing
Note: This Question is unanswered, help us to find answer for this one
83. The following portfolio has an expected return of _____ percent and a beta of _____.
Answer
Correct Answer:
10.99; 1.11
Note: This Question is unanswered, help us to find answer for this one
84. ________ monetizes the value of the data stored by search engines.
Answer
Correct Answer:
SEM
Note: This Question is unanswered, help us to find answer for this one
85. In a pert/cpm chart, each task has all of the following except a(n) ____.
Answer
Correct Answer:
Reference to successor tasks
Note: This Question is unanswered, help us to find answer for this one
86. Project scheduling involves all of the following except ____.
Answer
Correct Answer:
Defining project constraints
Note: This Question is unanswered, help us to find answer for this one
87. Three general classifications of organizational structures are _____, project, and matrix.
Answer
Correct Answer:
Functional
Note: This Question is unanswered, help us to find answer for this one
88. There are ____ basic reasons for creating dependencies among project activities.
Answer
Correct Answer:
Three
Note: This Question is unanswered, help us to find answer for this one
89. Teams can be broadly classified as either ____.
Answer
Correct Answer:
Functional or cross-functional
Note: This Question is unanswered, help us to find answer for this one
90. Which purpose does an OBS serve?
Answer
Correct Answer:
Establishes the on-boarding practices for bringing new team members to the project
Note: This Question is unanswered, help us to find answer for this one
91. In which stage of team development do the members of the project team begin to trust each other?
Answer
Correct Answer:
Norming
Note: This Question is unanswered, help us to find answer for this one
92. A project management team has subcontracted work to a service company. Which of the following tools is the best choice to ensure that this company will be able to meet the quality requirements of the project?
Answer
Correct Answer:
Quality audit
Note: This Question is unanswered, help us to find answer for this one
93. Which of the following does PRINCE2 focus on?
Answer
Correct Answer:
Controlled environments
Note: This Question is unanswered, help us to find answer for this one
94. Generally, in which project phase are risk and opportunity greater than the amount at stake?
Answer
Correct Answer:
Planning phase
Note: This Question is unanswered, help us to find answer for this one
95. Which measure are you most likely to use if you want to evaluate how much work effort remains on the project?
Answer
Correct Answer:
ETC
Note: This Question is unanswered, help us to find answer for this one
96. Which is the act of gathering and organizing resources to accomplish a goal?
Answer
Correct Answer:
Management
Note: This Question is unanswered, help us to find answer for this one
97. YWhich purpose does an OBS serve?
Answer
Correct Answer:
Identifies project risks that do not have a mitigation plan
Note: This Question is unanswered, help us to find answer for this one
98. What would you call the total planned value of a project?
Answer
Correct Answer:
Budget at completion (BAC)
Note: This Question is unanswered, help us to find answer for this one
99. You have prepared the plan and received sign-off from the team, and you are just about to get client sign-off. Which project phase are you in?
Answer
Correct Answer:
Project planning
Note: This Question is unanswered, help us to find answer for this one
100. Taking an action to ensure that a defective or nonconforming item complies with requirements or specifications is known as:
Answer
Correct Answer:
rework.
Note: This Question is unanswered, help us to find answer for this one
101. Which project management graphic shows progress in terms of schedule, earned value, and cost versus budget?
Answer
Correct Answer:
S-curve
Note: This Question is unanswered, help us to find answer for this one
102. Which of the following is the expected total cost of the project at completion?
Answer
Correct Answer:
Estimated Cost at Completion (EAC)
Note: This Question is unanswered, help us to find answer for this one
103. The stakeholder analysis should be done in which stage of project management?
Answer
Correct Answer:
Initiation
Note: This Question is unanswered, help us to find answer for this one
104. Which of the following describes the effect on project objectives if a specific risk event occurs?
Answer
Correct Answer:
Risk consequences
Note: This Question is unanswered, help us to find answer for this one
105. Which term refers to a project environment where project contributors do not report organizationally to a project manager?
Answer
Correct Answer:
Matrix
Note: This Question is unanswered, help us to find answer for this one
106. Which are the most common parts of a stand-up meeting?
Answer
Correct Answer:
Reporting the progress on the project since the last meeting, reporting of plans until the next meeting, noting issues that are delaying progress
Note: This Question is unanswered, help us to find answer for this one
107. What is the process of administering actionable tasks called?
Answer
Correct Answer:
Delegation
Note: This Question is unanswered, help us to find answer for this one
108. Which is a formal approved document that defines how a project is executed, monitored and controlled and closed?
Answer
Correct Answer:
Project Management Plan
Note: This Question is unanswered, help us to find answer for this one
109. In which phase is the Project Manager for a project identified?
Answer
Correct Answer:
Project initiation
Note: This Question is unanswered, help us to find answer for this one
110. Which of the following is NOT an interpersonal skill a project manager should use when managing stakeholders expectations?
Answer
Correct Answer:
Managing change requests
Note: This Question is unanswered, help us to find answer for this one
111. A stakeholder has been made aware of an overbudgeted, overstaffed, and underperformed project. How should the Project Manager respond?
Answer
Correct Answer:
Identifying the details and environment surrounding the issues and enacting a post-assessment plan
Note: This Question is unanswered, help us to find answer for this one
112. Which type of chart displays the project start and finish dates?
Answer
Correct Answer:
Gannt
Note: This Question is unanswered, help us to find answer for this one
113. For which task should a WBS be used?
Answer
Correct Answer:
Identifying activities needed to create deliverables
Note: This Question is unanswered, help us to find answer for this one
114. This plan documents the approach to communicating effectively and efficiently with stakeholders.
Answer
Correct Answer:
Communications Management Plan
Note: This Question is unanswered, help us to find answer for this one
115. Which of the following may be a result of failed deadlines?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
116. Which of the following should the project manager create to ensure that all work is included in the project plan?
Answer
Correct Answer:
WBS
Note: This Question is unanswered, help us to find answer for this one
117. Which is a technique used to determine whether particular work can be accomplished by the project team or must be purchased from an outside source?
Answer
Correct Answer:
Make-or-buy analysis
Note: This Question is unanswered, help us to find answer for this one
118. Which of the following constitutes one of the major areas of cost growth?
Answer
Correct Answer:
Scope change
Note: This Question is unanswered, help us to find answer for this one
119. A client has added tasks to a contracted project without full disclosure. What is this called?
Answer
Correct Answer:
Scope Creep
Note: This Question is unanswered, help us to find answer for this one
120. If you believe the likelihood of a milestone occurring is sufficient, you should list this probability as an:
Answer
Correct Answer:
assumption.
Note: This Question is unanswered, help us to find answer for this one
121. Which type of project management is typically used in technology and software development?
Answer
Correct Answer:
Agile project management
Note: This Question is unanswered, help us to find answer for this one
122. This action reduces the probability and/or impact of an adverse risk event to below an acceptable level.
Answer
Correct Answer:
Risk mitigation
Note: This Question is unanswered, help us to find answer for this one
123. Which of the following handles Customer Requirement Documentation?
Answer
Correct Answer:
Business analysis team
Note: This Question is unanswered, help us to find answer for this one
124. Which of the following should oversee the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information??
Answer
Correct Answer:
Project Communications Management
Note: This Question is unanswered, help us to find answer for this one
125. Which would be the least effective course of action if several activities have taken longer than expected?
Answer
Correct Answer:
Hope that later activities will make up for the loss of time
Note: This Question is unanswered, help us to find answer for this one
126. The project closes with:
Answer
Correct Answer:
project review.
Note: This Question is unanswered, help us to find answer for this one
127. Project Governance involves:
Answer
Correct Answer:
sharing practices with team and assigning roles in monitoring.
Note: This Question is unanswered, help us to find answer for this one
128. Which must a project manager complete to create clear boundaries for project completion?
Answer
Correct Answer:
Scope statement
Note: This Question is unanswered, help us to find answer for this one
129. Which of the following is part of the process of Project Review?
Answer
Correct Answer:
Monitoring project performance and control of risks
Note: This Question is unanswered, help us to find answer for this one
130. What does a Project Lifecycle consist of?
Answer
Correct Answer:
A logical sequence of project phases comprising of associated activities
Note: This Question is unanswered, help us to find answer for this one
131. Which of the following is Cost Variance used to monitor?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
132. Which is the key attribute of a kickoff meeting?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
133. For which task is the Project Manager responsible?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
134. Which of the following is the project manager responsible for?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
135. What steps is the Project Closure phase comprised of?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
136. What is the prime role of a Project Manager?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
137. Who are the stakeholders of a project?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
138. Which of the following consists of all the processes that ensure that only the work absolutely necessary to successfully complete the project has been defined?
Answer
Correct Answer:
Project Scope Management
Note: This Question is unanswered, help us to find answer for this one
139. Who is responsible for code testing?
Answer
Correct Answer:
Both the coder and tester
Note: This Question is unanswered, help us to find answer for this one
140. Four components of Eisenhower Matrix are:
Answer
Correct Answer:
B-Tasks, A-Tasks, Tasks for Dustbin, C-Tasks
Note: This Question is unanswered, help us to find answer for this one
141. The focus on what outcomes should change in project management is the:
Answer
Correct Answer:
Benefits realisation management
Note: This Question is unanswered, help us to find answer for this one
142. What project management graphic shows you progress in terms of schedule, earned value and cost versus budget?
Answer
Correct Answer:
S-curve
Note: This Question is unanswered, help us to find answer for this one
143. ______ is action taken to ensure that a defective or nonconforming item complies with requirements or specifications
Answer
Correct Answer:
Rework
Note: This Question is unanswered, help us to find answer for this one
144. _______ is the total planned value for the project and constitutes the cost performance baseline.
Answer
Correct Answer:
Budget at Completion (BAC)
Note: This Question is unanswered, help us to find answer for this one
145. What types of project change qualify for change management?
Answer
Correct Answer:
Change of team members.
Note: This Question is unanswered, help us to find answer for this one
146. You have prepared the plan, received sign-off from the team, and are just about to get client sign-off. Which project phase are you in?
Answer
Correct Answer:
Project planning
Note: This Question is unanswered, help us to find answer for this one
147. Which of the following is NOT an input in the project management plan process?
Answer
Correct Answer:
Change Management Plan
Note: This Question is unanswered, help us to find answer for this one
148. You have one client, a technical resource, a design resource, an advisor, and yourself on a project. How many paths of two way communications are there to manage if all of them have complete access to each other?
Answer
Correct Answer:
10
Note: This Question is unanswered, help us to find answer for this one
149. Which of the following is NOT a process in project time management?
Answer
Correct Answer:
Review schedule
Note: This Question is unanswered, help us to find answer for this one
150. Which of these IS a valid earned value rule?
Answer
Correct Answer:
25/75
Note: This Question is unanswered, help us to find answer for this one
151. What purpose does an OBS serve?
Answer
Correct Answer:
Organizes project stakeholders within the context of a project.
Note: This Question is unanswered, help us to find answer for this one
152. How many phases are there in a common phase-gate model?
Answer
Correct Answer:
6
Note: This Question is unanswered, help us to find answer for this one
153. The act of gathering and organizing resources to accomplish a goal is called what?
Answer
Correct Answer:
Management
Note: This Question is unanswered, help us to find answer for this one
154. Which of the following is NOT a process in Project Communications Management?
Answer
Correct Answer:
Manage project team expectations
Note: This Question is unanswered, help us to find answer for this one
155. Projectized refers to what?
Answer
Correct Answer:
An organizational structure where the team members report directly to a project manager.
Note: This Question is unanswered, help us to find answer for this one
156. Which of the following would NOT be suitable for project management?
Answer
Correct Answer:
The management of a telephone call centre
Note: This Question is unanswered, help us to find answer for this one
157. If you want to evaluate how much work effort remains on the project, what measure are you most likely to use?
Answer
Correct Answer:
ETC
Note: This Question is unanswered, help us to find answer for this one
158. Which of the following is NOT a critical practice for a software project?
Answer
Correct Answer:
Customer management
Note: This Question is unanswered, help us to find answer for this one
159. In what stage of team development do the members of the project team begin to trust each other?
Answer
Correct Answer:
Norming
Note: This Question is unanswered, help us to find answer for this one
160. Generally, in what project phase is risk and opportunity greater than the amount at stake?
Answer
Correct Answer:
Planning phase
Note: This Question is unanswered, help us to find answer for this one
161. Alarmed by lagging progress, a project manager chooses to crash the schedule. What is s/he doing?
Answer
Correct Answer:
Adding additional resources to decrease the duration of future activities.
Note: This Question is unanswered, help us to find answer for this one
162. Project closes with:
Answer
Correct Answer:
Project review
Note: This Question is unanswered, help us to find answer for this one
163. ______ is the degree to which a set of characteristics fulfills requirements.
Answer
Correct Answer:
Quality
Note: This Question is unanswered, help us to find answer for this one
164. ________ is a provision, usually time or money, to mitigate cost and/or schedule risk.
Answer
Correct Answer:
Reserve
Note: This Question is unanswered, help us to find answer for this one
165. What is a WBS input?
Answer
Correct Answer:
Items needed before an activity can be done.
Note: This Question is unanswered, help us to find answer for this one
166. A project management team has subcontracted work to a service company. Which of the following tools is the best choice to assure that this company will be able to meet the quality requirements of the project?
Answer
Correct Answer:
Quality audit
Note: This Question is unanswered, help us to find answer for this one
167. What is the origin of the traditional project management's nickname "Waterfall?"
Answer
Correct Answer:
The look of project activities scheduled back to back on a Gantt chart.
Note: This Question is unanswered, help us to find answer for this one
168. What is the main responsibility of the Steering Committe during Project Execution?
Answer
Correct Answer:
Making clear and timely decisions
Note: This Question is unanswered, help us to find answer for this one
169. A burndown chart is used for which of the following purposes?
Answer
Correct Answer:
To visualize schedule progress.
Note: This Question is unanswered, help us to find answer for this one
170. Which of the following is NOT a cost estimate tool or technique?
Answer
Correct Answer:
Delphi method
Note: This Question is unanswered, help us to find answer for this one
171. Which one of the following is NOT in Maslow's hierarchy of needs?
Answer
Correct Answer:
Self Performance
Note: This Question is unanswered, help us to find answer for this one
172. What project document is best used to document initial roles, scope, and expectations?
Answer
Correct Answer:
Project charter
Note: This Question is unanswered, help us to find answer for this one
173. What is scope creep?
Answer
Correct Answer:
Features and deliverables not agreed to in the original plan.
Note: This Question is unanswered, help us to find answer for this one
174. Which of the following is NOT an example of a cost of quality?
Answer
Correct Answer:
Gold-plating
Note: This Question is unanswered, help us to find answer for this one
175. What is the purpose of the process to collect requirements?
Answer
Correct Answer:
To define and document stakeholders' needs to meet the project objectives.
Note: This Question is unanswered, help us to find answer for this one
176. Sometimes there is a waiting period between two sequential tasks. What is this span of empty time called?
Answer
Correct Answer:
Float
Note: This Question is unanswered, help us to find answer for this one
177. Which of the following is NOT a process in Project Procurement Management?
Answer
Correct Answer:
Retain procurements
Note: This Question is unanswered, help us to find answer for this one
178. What are the most common attributes in a risk register?
Answer
Correct Answer:
Probability, impact
Note: This Question is unanswered, help us to find answer for this one
179. Customer Requirement Documentation is done by the:
Answer
Correct Answer:
Business analysis team
Note: This Question is unanswered, help us to find answer for this one
180. _______ authorizes a project or phase of a project.
Answer
Correct Answer:
Project Charter
Note: This Question is unanswered, help us to find answer for this one
181. You are assembling a team and building understanding of the project needs. Which project phase are you in?
Answer
Correct Answer:
Project initiation
Note: This Question is unanswered, help us to find answer for this one
182. Which of the following is NOT a commonly used tool or technique to collect requirements?
Answer
Correct Answer:
Review Project Plan
Note: This Question is unanswered, help us to find answer for this one
183. What term refers to a project environment where project contributors do not report organizationally to a project manager?
Answer
Correct Answer:
Matrix
Note: This Question is unanswered, help us to find answer for this one
184. You notice that several activities have taken longer than expected. What would be the least effective course of action?
Answer
Correct Answer:
Hope that later activities will make up for the loss of time.
Note: This Question is unanswered, help us to find answer for this one
185. Which of the following aspects of a project are known as the project management triangle?
Answer
Correct Answer:
Scope, schedule, cost
Note: This Question is unanswered, help us to find answer for this one
186. ________ is reducing the probability and/or impact of an adverse risk event to below an acceptable level.
Answer
Correct Answer:
Risk mitigation
Note: This Question is unanswered, help us to find answer for this one
187. _______ is giving the customer more than what was required.
Answer
Correct Answer:
Gold-plating
Note: This Question is unanswered, help us to find answer for this one
188. _______ is the formal process to review, approve, and manage changes to project deliverables, documents, and the project management plan throughout the project.
Answer
Correct Answer:
Integrated Change Control
Note: This Question is unanswered, help us to find answer for this one
189. ________ a technique used to determine whether particular work can be accomplished by the project team or must be purchased from an outside source.
Answer
Correct Answer:
Make-or-buy analysis
Note: This Question is unanswered, help us to find answer for this one
190. ________ is the effect on project objectives if the risk event occurs.
Answer
Correct Answer:
Risk consequences
Note: This Question is unanswered, help us to find answer for this one
191. Which of the following is not a common communication tool for project managers?
Answer
Correct Answer:
Code register
Note: This Question is unanswered, help us to find answer for this one
192. Customer Requirement is captured during:
Answer
Correct Answer:
Project initiation phase
Note: This Question is unanswered, help us to find answer for this one
193. A client has added tasks to a contracted project without full disclosure. This is called?
Answer
Correct Answer:
Scope Creep
Note: This Question is unanswered, help us to find answer for this one
194. Which of these is the first phase of Project management?
Answer
Correct Answer:
Initiation
Note: This Question is unanswered, help us to find answer for this one
195. ________ constitutes one of the major areas of cost growth.
Answer
Correct Answer:
Scope change
Note: This Question is unanswered, help us to find answer for this one
196. If you believe the likelihood of a milestone occurring is sufficient, you could list this probability as what?
Answer
Correct Answer:
Assumption
Note: This Question is unanswered, help us to find answer for this one
197. You are monitoring the schedule progress and evaluating budget. You see a trend of going over budget and are having conversations to correct the issue. Which project phase are you in?
Answer
Correct Answer:
Project control
Note: This Question is unanswered, help us to find answer for this one
198. Quantitative Project Management is best used for?
Answer
Correct Answer:
Predicting Cost and Schedule Overruns
Note: This Question is unanswered, help us to find answer for this one
199. Which of the following is NOT a source selection criteria used in contract procurement?
Answer
Correct Answer:
open change requests
Note: This Question is unanswered, help us to find answer for this one
200. The team just discovered an significant unplanned cost. Which of the following is not a way to resolve this?
Answer
Correct Answer:
Proceed with the project and hope that things sort out.
Note: This Question is unanswered, help us to find answer for this one
201. _______ is the expected total cost of the project at completion.
Answer
Correct Answer:
Estimated Cost at Completion (EAC)
Note: This Question is unanswered, help us to find answer for this one
202. Which of the following is NOT one of the indicators of a team's effectiveness?
Answer
Correct Answer:
Individual team members try to outperform one another.
Note: This Question is unanswered, help us to find answer for this one
203. Which of the following is NOT a feature of an issues log?
Answer
Correct Answer:
The project team member that caused the issue is identified
Note: This Question is unanswered, help us to find answer for this one
204. With a little time to create a team, a Project Manager should value ________.
Answer
Correct Answer:
Availability & Skill Set
Note: This Question is unanswered, help us to find answer for this one
205. The process of administering actionable tasks is called?
Answer
Correct Answer:
Delegation
Note: This Question is unanswered, help us to find answer for this one
206. The _________ calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer.
Answer
Correct Answer:
Critical path method
Note: This Question is unanswered, help us to find answer for this one
207. _______ consists of all the processes that ensure that the work necessary, and only the work necessary, to successfully complete the project has been defined.
Answer
Correct Answer:
Project Scope Management
Note: This Question is unanswered, help us to find answer for this one
208. Which one of the following is NOT one of the four P's that effective software project management focuses on?
Answer
Correct Answer:
Perspective
Note: This Question is unanswered, help us to find answer for this one
209. Which is NOT included in the 7 keys to success proposed by IBM?
Answer
Correct Answer:
Complex tasks are postponed
Note: This Question is unanswered, help us to find answer for this one
210. ________ is acknowledging a risk but taking no action to avoid, transfer, or mitigate it.
Answer
Correct Answer:
Risk acceptance
Note: This Question is unanswered, help us to find answer for this one
211. _______ is the processes and activities that determine quality policies, objectives, and responsibilities which ensure that the project will satisfy the needs for which it was undertaken.
Answer
Correct Answer:
Project Quality Management
Note: This Question is unanswered, help us to find answer for this one
212. What is involved with fast tracking a schedule?
Answer
Correct Answer:
Arranging some project activities to happen concurrently, rather than sequentially.
Note: This Question is unanswered, help us to find answer for this one
213. Add this type of clause to a deadline agreement for a project with great scope?
Answer
Correct Answer:
Extension Clause
Note: This Question is unanswered, help us to find answer for this one
214. What are the most common parts of a stand-up meeting?
Answer
Correct Answer:
Reporting the progress on the project since the last meeting, reporting of plans until the next meeting, noting issues that are delaying progress.
Note: This Question is unanswered, help us to find answer for this one
215. The team is working on the project and regular communication is happening between the project manager, the team, and the client. Which project phase are you in?
Answer
Correct Answer:
Project execution
Note: This Question is unanswered, help us to find answer for this one
216. When is a WBS used?
Answer
Correct Answer:
When identifying activities needed to create deliverables.
Note: This Question is unanswered, help us to find answer for this one
217. The _________ documents the approach to communicate effectively and efficiently with stakeholders.
Answer
Correct Answer:
Communications Management Plan
Note: This Question is unanswered, help us to find answer for this one
218. A stakeholder has been made aware of an overbudgeted, overstaffed, and underperformed project. A Project Manager should respond by_________.
Answer
Correct Answer:
Identifying the details and environment surrounding the issues and enacting a post-assessment plan
Note: This Question is unanswered, help us to find answer for this one
219. This type of chart displays a project start and finish date?
Answer
Correct Answer:
Gannt
Note: This Question is unanswered, help us to find answer for this one
220. What is a project manager called when using scrum methodologies?
Answer
Correct Answer:
Scrum Master
Note: This Question is unanswered, help us to find answer for this one
221. High Severity Risk in a project:
Answer
Correct Answer:
Impacts negatively on progress and success of project
Note: This Question is unanswered, help us to find answer for this one
222. What does SV stand for?
Answer
Correct Answer:
Schedule Variance
Note: This Question is unanswered, help us to find answer for this one
223. A sponsor has requested a fixed budget and a fixed scope. What is the most effective way to plan?
Answer
Correct Answer:
Clarify with the sponsor which project attribute is most important to them. Plan the project with that attribute fixed.
Note: This Question is unanswered, help us to find answer for this one
224. Who is responsible for conducting formal or informal assessments of the project team's performance?
Answer
Correct Answer:
Project management team
Note: This Question is unanswered, help us to find answer for this one
225. Triple constraint of a project is:
Answer
Correct Answer:
Scope, schedule, cost
Note: This Question is unanswered, help us to find answer for this one
226. An effective Project manager will cancel a failing project only after this process?
Answer
Correct Answer:
Project Assessment
Note: This Question is unanswered, help us to find answer for this one
227. _______ is the processes involved in estimating, budgeting, and controlling costs so the project can be completed within the approved budget.
Answer
Correct Answer:
Project Cost Management
Note: This Question is unanswered, help us to find answer for this one
228. Which of these is not a stage of Project Development?
Answer
Correct Answer:
Interpolation
Note: This Question is unanswered, help us to find answer for this one
229. The quantity of time that will elapse from the start of an activity to its end is called what?
Answer
Correct Answer:
Duration
Note: This Question is unanswered, help us to find answer for this one
230. A team leader's job is to ______ a group's collaborative work.
Answer
Correct Answer:
Oversee
Note: This Question is unanswered, help us to find answer for this one
231. Project Governance is about:
Answer
Correct Answer:
Sharing practices with team and assigning roles in monitoring
Note: This Question is unanswered, help us to find answer for this one
232. The deliverables have been signed off and teams have stopped working on the project. Which project phase are you in?
Answer
Correct Answer:
Project closure
Note: This Question is unanswered, help us to find answer for this one
233. Which of the following is NOT an interpersonal skill a project manager should use in managing stakeholders expectations?
Answer
Correct Answer:
Denying change requests
Note: This Question is unanswered, help us to find answer for this one
234. True or False? The closing stage consists of more than one type of closure?
Answer
Correct Answer:
True
Note: This Question is unanswered, help us to find answer for this one
235. Project Manager for a project is identified during:
Answer
Correct Answer:
Project Initiation
Note: This Question is unanswered, help us to find answer for this one
236. _______ is a formal approved document that defines how a project is executed, monitored and controlled, and closed.
Answer
Correct Answer:
Project Management Plan
Note: This Question is unanswered, help us to find answer for this one
237. Project Review is a process of:
Answer
Correct Answer:
Monitoring project performance and control of risks
Note: This Question is unanswered, help us to find answer for this one
238. Which groups are included as project stakeholders?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
239. When is the best time to close a project?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
240. Project Lifecycle is:
Answer
Correct Answer:
A logical sequence of project phases comprising of associated activities
Note: This Question is unanswered, help us to find answer for this one
241. Initiation is used to identify which of the following?
Answer
Correct Answer:
All of the Above
Note: This Question is unanswered, help us to find answer for this one
242. Quality Control can be monitored by creating these?
Answer
Correct Answer:
All of the Above
Note: This Question is unanswered, help us to find answer for this one
243. The point of planning is to ______.
Answer
Correct Answer:
Understand whats needs to be done
Note: This Question is unanswered, help us to find answer for this one
244. Tester's job is to:
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
245. Which of these is not a stage of Project management?
Answer
Correct Answer:
Cleansing
Note: This Question is unanswered, help us to find answer for this one
246. More rework in a project means:
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
247. What would a project manager need to understand in order to properly sequence activities in a WBS?
Answer
Correct Answer:
All of the above
Note: This Question is unanswered, help us to find answer for this one
248. What are the key attributes of a kickoff meeting?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
249. Prime role of a Project Manager is:
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
250. What is the project manager responsible to do?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
251. Project Closure comprises of :
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
252. Project Manager is responsible for:
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
253. The stakeholders of a project are the:
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
254. What would be included as part of the "Triple constraint."
Answer
Correct Answer:
Scope, Schedule, or Budget
Note: This Question is unanswered, help us to find answer for this one
255. If customer requirements are not met:
Answer
Correct Answer:
A project can't be treated as successful
Note: This Question is unanswered, help us to find answer for this one
256. Failed deadlines may result in which of the following?
Answer
Correct Answer:
All of these
Note: This Question is unanswered, help us to find answer for this one
257. Project Plan primarily consists of:
Answer
Correct Answer:
Project tasks, priority, allocated to, and target date
Note: This Question is unanswered, help us to find answer for this one
258. Code testing is the job of:
Answer
Correct Answer:
Both coder and tester
Note: This Question is unanswered, help us to find answer for this one