MCQs > Finance & Management > Project Management MCQs > Basic Project Management MCQs

Basic Project Management MCQ

1. A project managers planning _____.

Answer

Correct Answer: Includes identifying project tasks and estimating completion times and costs

Note: This Question is unanswered, help us to find answer for this one

2. In the ________ stage of what is a project?, a major portion of the actual project work performed.

Answer

Correct Answer: Executing

Note: This Question is unanswered, help us to find answer for this one

3. It is good practice to document meeting minutes, focusing on key decisions and ____ items.

Answer

Correct Answer: Action

Note: This Question is unanswered, help us to find answer for this one

4. A _____ is a standard of measurement in quality management.

Answer

Correct Answer: Metric

Note: This Question is unanswered, help us to find answer for this one

5. A _____ cannot be started until one or more other tasks are completed.

Answer

Correct Answer: Dependent task

Note: This Question is unanswered, help us to find answer for this one

6. A ____ path includes all tasks that are vital to the project schedule.

Answer

Correct Answer: Critical

Note: This Question is unanswered, help us to find answer for this one

7. _____ is the product of a risk event probability and the risk events monetary value.

Answer

Correct Answer: Expected Monetary Value (EMV)

Note: This Question is unanswered, help us to find answer for this one

8. _____ is the degree to which a system performs its intended function.

Answer

Correct Answer: Functionality

Note: This Question is unanswered, help us to find answer for this one

9. _____ is a planning process that is within the project scope management knowledge area.

Answer

Correct Answer: Creation of a WBS

Note: This Question is unanswered, help us to find answer for this one

10. _____ involves building individual and group skills to enhance project performance.

Answer

Correct Answer: Developing the project team

Note: This Question is unanswered, help us to find answer for this one

11. A(n) ____ chart displays complex task patterns and relationships.

Answer

Correct Answer: PERT/CPM

Note: This Question is unanswered, help us to find answer for this one

12. Enterprise environmental factors are an output of the executing process of _____.

Answer

Correct Answer: Project human resource management

Note: This Question is unanswered, help us to find answer for this one

13. The term _____ is used to describe risks that the project team has identified and analyzed.

Answer

Correct Answer: Known risks

Note: This Question is unanswered, help us to find answer for this one

14. A(n) _____ is a contract clause that allows the buyer or supplier to end the contract.

Answer

Correct Answer: Termination clause

Note: This Question is unanswered, help us to find answer for this one

15. The __________ should include requirements for formal acceptance and closure of contracts.

Answer

Correct Answer: Contract itself

Note: This Question is unanswered, help us to find answer for this one

16. The _____ line for any e-mail messages you write should clearly state the intention of the e-mail.

Answer

Correct Answer: Subject

Note: This Question is unanswered, help us to find answer for this one

17. Complete the formula: sample size = 0.25 * ( _____ /acceptable error)2

Answer

Correct Answer: Certainty factor

Note: This Question is unanswered, help us to find answer for this one

18. As the number of people involved in a project _____, the complexity of communications _____.

Answer

Correct Answer: Increases, increases

Note: This Question is unanswered, help us to find answer for this one

19. An example of push communication is _____.

Answer

Correct Answer: Voice mails

Note: This Question is unanswered, help us to find answer for this one

20. According to thamhain and wilemon, _____ is the ability to improve a workers position.

Answer

Correct Answer: Promotion

Note: This Question is unanswered, help us to find answer for this one

21. A(n) _____ is a column chart that shows the number of resources assigned to a project over time.

Answer

Correct Answer: Resource histogram

Note: This Question is unanswered, help us to find answer for this one

22. A _____ person achieves a balance between risk and payoff.

Answer

Correct Answer: Risk-neutral

Note: This Question is unanswered, help us to find answer for this one

23. The term ____ describes a product produced as part of a project.

Answer

Correct Answer: Scope

Note: This Question is unanswered, help us to find answer for this one

24. The most common approach for closing or terminating a project is through _______.

Answer

Correct Answer: Integration.

Note: This Question is unanswered, help us to find answer for this one

25. The main tool for performing scope verification is ____.

Answer

Correct Answer: Inspection

Note: This Question is unanswered, help us to find answer for this one

26. Stakeholders can be categorized as ____ if they are aware of the project yet do not like change.

Answer

Correct Answer: Resistant

Note: This Question is unanswered, help us to find answer for this one

27. Scope ______ is often achieved by a customer inspection and then sign-off on key deliverables.

Answer

Correct Answer: Validation

Note: This Question is unanswered, help us to find answer for this one

28. On a pert chart, an arrow from "activity d" to "activity e" indicates that _______.

Answer

Correct Answer: Activity D must be completed before Activity E can start

Note: This Question is unanswered, help us to find answer for this one

29. Microsofts risk management model includes _____, which specifies the risk type.

Answer

Correct Answer: Category.

Note: This Question is unanswered, help us to find answer for this one

30. Microsoft claims that the microsoft project software can _____.

Answer

Correct Answer: Assign ownership of risks

Note: This Question is unanswered, help us to find answer for this one

31. Microsoft claims that microsoft project has the capability of ____.

Answer

Correct Answer: Assign ownership of risks

Note: This Question is unanswered, help us to find answer for this one

32. A(n) _____ stakeholder is aware of the project yet resistant to change.

Answer

Correct Answer: Resistant

Note: This Question is unanswered, help us to find answer for this one

33. A(n) _____ is a recognizable reference point that can be used to monitor progress.

Answer

Correct Answer: Event

Note: This Question is unanswered, help us to find answer for this one

34. A(n) _____ is a document that contains results of various risk management processes.

Answer

Correct Answer: Risk register

Note: This Question is unanswered, help us to find answer for this one

35. A(n) _____ documents the procedures for managing risk throughout the project.

Answer

Correct Answer: Risk management plan

Note: This Question is unanswered, help us to find answer for this one

36. ____ includes the actual amount of time spent working on an activity plus elapsed time.

Answer

Correct Answer: Duration

Note: This Question is unanswered, help us to find answer for this one

37. There are ____ main processes involved in project scope management.

Answer

Correct Answer: Five

Note: This Question is unanswered, help us to find answer for this one

38. System or process _____ are diagrams that show how different parts of a system interrelate.

Answer

Correct Answer: Flowcharts

Note: This Question is unanswered, help us to find answer for this one

39. In a(n) _____ organizational structure, project managers have little or no authority.

Answer

Correct Answer: Functional

Note: This Question is unanswered, help us to find answer for this one

40. Payment alternatives are part of the ____ phase of the research-based buying process.

Answer

Correct Answer: Selection and purchase

Note: This Question is unanswered, help us to find answer for this one

41. A(n)_____ is a series of actions directed toward a particular result.

Answer

Correct Answer: Process

Note: This Question is unanswered, help us to find answer for this one

42. A project has each of the following characteristics except ________.

Answer

Correct Answer: Low risk with a high profit potential or benefit

Note: This Question is unanswered, help us to find answer for this one

43. _____ are the system?s special characteristics that appeal to users.

Answer

Correct Answer: Features

Note: This Question is unanswered, help us to find answer for this one

44. ____ describe what the project team has accomplished during a certain period.

Answer

Correct Answer: Progress reports

Note: This Question is unanswered, help us to find answer for this one

45. Tasks in a wbs that are decomposed into smaller tasks are called _____ tasks.

Answer

Correct Answer: Summary

Note: This Question is unanswered, help us to find answer for this one

46. The ______ documents how project needs will be analyzed, documented, and managed.

Answer

Correct Answer: Requirements management plan

Note: This Question is unanswered, help us to find answer for this one

47. The _____ represents the number of units handled correctly through the process steps.

Answer

Correct Answer: Yield

Note: This Question is unanswered, help us to find answer for this one

48. Some projects have a senior manager called a(n)_____ who acts as a key proponent for a project.

Answer

Correct Answer: Champion

Note: This Question is unanswered, help us to find answer for this one

49. According to maslow, only after meeting _____ needs can individuals act upon growth needs.

Answer

Correct Answer: Deficiency

Note: This Question is unanswered, help us to find answer for this one

50. _____ means the project?s processes and products meet written specifications.

Answer

Correct Answer: Onformance to requirements

Note: This Question is unanswered, help us to find answer for this one

51. _____ is a technique for resolving resource conflicts by delaying tasks.

Answer

Correct Answer: Resource leveling

Note: This Question is unanswered, help us to find answer for this one

52. _____ involves determining the information and communications needs of the stakeholders.

Answer

Correct Answer: Planning communications

Note: This Question is unanswered, help us to find answer for this one

53. Subdividing the project deliverables into smaller pieces is known as _____.

Answer

Correct Answer: Decomposition

Note: This Question is unanswered, help us to find answer for this one

54. In project time management, a(n) _____ is an output of controlling the schedule

Answer

Correct Answer: Project management plan update

Note: This Question is unanswered, help us to find answer for this one

55. Identifying risks is a subprocess of the _____ process of project risk management.

Answer

Correct Answer: Planning

Note: This Question is unanswered, help us to find answer for this one

56. Pmi uses the term “_____” to describe each level of work in the wbs.

Answer

Correct Answer: Task

Note: This Question is unanswered, help us to find answer for this one

57. In an aoa network diagram, ____ occur when two or more activities follow a single node.

Answer

Correct Answer: Bursts

Note: This Question is unanswered, help us to find answer for this one

58. _____ involves identifying, evaluating, and managing changes throughout the project life cycle.

Answer

Correct Answer: Integrated change control

Note: This Question is unanswered, help us to find answer for this one

59. _____ helps professionals to see the effects of changing one or more variables on an outcome.

Answer

Correct Answer: Sensitivity analysis

Note: This Question is unanswered, help us to find answer for this one

60. _____ can be classified as internal to the organization or external.

Answer

Correct Answer: Project Stakeholders

Note: This Question is unanswered, help us to find answer for this one

61. _____ are those costs that are difficult to measure in monetary terms

Answer

Correct Answer: Intangible costs

Note: This Question is unanswered, help us to find answer for this one

62. ____ dependencies involve relationships between project and non-project activities.

Answer

Correct Answer: External

Note: This Question is unanswered, help us to find answer for this one

63. ____ dependencies are inherent in the nature of the work being performed on a project.

Answer

Correct Answer: Discretionary

Note: This Question is unanswered, help us to find answer for this one

64. Aoa network diagrams use only _____ dependencies.

Answer

Correct Answer: Finish-to-start

Note: This Question is unanswered, help us to find answer for this one

65. A(n) _____ on a project is a significant event that normally has no duration.

Answer

Correct Answer: Milestone

Note: This Question is unanswered, help us to find answer for this one

66. A products quality is determined by its ____.

Answer

Correct Answer: Durability, reliability, and serviceability

Note: This Question is unanswered, help us to find answer for this one

67. A(n)_____ is the original project plan plus approved changes.

Answer

Correct Answer: Baseline

Note: This Question is unanswered, help us to find answer for this one

68. The main purpose of the planning phase in a project is to ________.

Answer

Correct Answer: Determine who will do what and by when

Note: This Question is unanswered, help us to find answer for this one

69. A _____ is usually not necessary to the scrum method.

Answer

Correct Answer: Team contract

Note: This Question is unanswered, help us to find answer for this one

70. _____ correct(s) or prevent(s) further quality problems based on quality control measurements.

Answer

Correct Answer: Process adjustments

Note: This Question is unanswered, help us to find answer for this one

71. When leveling schedules to overcome resource constraints, ________ is increased.

Answer

Correct Answer: Scheduling complexity

Note: This Question is unanswered, help us to find answer for this one

72. Each task in a systems development project should culminate in one or more ________.

Answer

Correct Answer: Deliverables

Note: This Question is unanswered, help us to find answer for this one

73. The challenges of managing large-scale systems development projects arise from ________.

Answer

Correct Answer: Lack of coordination

Note: This Question is unanswered, help us to find answer for this one

74. Activities on the critical path of a project have ____ slack time.

Answer

Correct Answer: Zero

Note: This Question is unanswered, help us to find answer for this one

75. Releasing the project team typically occurs _________ during the closure phase.

Answer

Correct Answer: Gradually

Note: This Question is unanswered, help us to find answer for this one

76. Project management restructuring allowed companies to manage projects that _____.

Answer

Correct Answer: Could not be handled by the traditional organization

Note: This Question is unanswered, help us to find answer for this one

77. _____ involves reducing the impact of a risk event by reducing the probability of its occurrence.

Answer

Correct Answer: Risk mitigation

Note: This Question is unanswered, help us to find answer for this one

78. _____ involves prioritizing risks based on their probability and impact of occurrence.

Answer

Correct Answer: Performing qualitative risk analysis

Note: This Question is unanswered, help us to find answer for this one

79. _____ involves numerically estimating the effects of risks on project objectives.

Answer

Correct Answer: Performing quantitative risk analysis

Note: This Question is unanswered, help us to find answer for this one

80. _____ involves doing whatever you can to make sure the positive risk happens.

Answer

Correct Answer: Risk exploitation

Note: This Question is unanswered, help us to find answer for this one

81. _____ involves deciding how to approach and plan the risk management activities for the project.

Answer

Correct Answer: Planning risk management

Note: This Question is unanswered, help us to find answer for this one

82. _____ involves allocating ownership of the risk to another party.

Answer

Correct Answer: Risk sharing

Note: This Question is unanswered, help us to find answer for this one

83. The following portfolio has an expected return of _____ percent and a beta of _____.

Answer

Correct Answer: 10.99; 1.11

Note: This Question is unanswered, help us to find answer for this one

84. ________ monetizes the value of the data stored by search engines.

Answer

Correct Answer: SEM

Note: This Question is unanswered, help us to find answer for this one

85. In a pert/cpm chart, each task has all of the following except a(n) ____.

Answer

Correct Answer: Reference to successor tasks

Note: This Question is unanswered, help us to find answer for this one

86. Project scheduling involves all of the following except ____.

Answer

Correct Answer: Defining project constraints

Note: This Question is unanswered, help us to find answer for this one

87. Three general classifications of organizational structures are _____, project, and matrix.

Answer

Correct Answer: Functional

Note: This Question is unanswered, help us to find answer for this one

88. There are ____ basic reasons for creating dependencies among project activities.

Answer

Correct Answer: Three

Note: This Question is unanswered, help us to find answer for this one

89. Teams can be broadly classified as either ____.

Answer

Correct Answer: Functional or cross-functional

Note: This Question is unanswered, help us to find answer for this one

90. Which purpose does an OBS serve?

Answer

Correct Answer: Establishes the on-boarding practices for bringing new team members to the project

Note: This Question is unanswered, help us to find answer for this one

91. In which stage of team development do the members of the project team begin to trust each other?

Answer

Correct Answer: Norming

Note: This Question is unanswered, help us to find answer for this one

92. A project management team has subcontracted work to a service company. Which of the following tools is the best choice to ensure that this company will be able to meet the quality requirements of the project?

Answer

Correct Answer: Quality audit

Note: This Question is unanswered, help us to find answer for this one

93. Which of the following does PRINCE2 focus on?

Answer

Correct Answer: Controlled environments

Note: This Question is unanswered, help us to find answer for this one

94. Generally, in which project phase are risk and opportunity greater than the amount at stake?

Answer

Correct Answer: Planning phase

Note: This Question is unanswered, help us to find answer for this one

95. Which measure are you most likely to use if you want to evaluate how much work effort remains on the project?

Answer

Correct Answer: ETC

Note: This Question is unanswered, help us to find answer for this one

96. Which is the act of gathering and organizing resources to accomplish a goal?

Answer

Correct Answer: Management

Note: This Question is unanswered, help us to find answer for this one

97. YWhich purpose does an OBS serve?

Answer

Correct Answer: Identifies project risks that do not have a mitigation plan

Note: This Question is unanswered, help us to find answer for this one

98. What would you call the total planned value of a project?

Answer

Correct Answer: Budget at completion (BAC)

Note: This Question is unanswered, help us to find answer for this one

99. You have prepared the plan and received sign-off from the team, and you are just about to get client sign-off. Which project phase are you in?

Answer

Correct Answer: Project planning

Note: This Question is unanswered, help us to find answer for this one

100. Taking an action to ensure that a defective or nonconforming item complies with requirements or specifications is known as:

Answer

Correct Answer: rework.

Note: This Question is unanswered, help us to find answer for this one

101. Which project management graphic shows progress in terms of schedule, earned value, and cost versus budget?

Answer

Correct Answer: S-curve

Note: This Question is unanswered, help us to find answer for this one

102. Which of the following is the expected total cost of the project at completion?

Answer

Correct Answer: Estimated Cost at Completion (EAC)

Note: This Question is unanswered, help us to find answer for this one

103. The stakeholder analysis should be done in which stage of project management?

Answer

Correct Answer: Initiation

Note: This Question is unanswered, help us to find answer for this one

104. Which of the following describes the effect on project objectives if a specific risk event occurs?

Answer

Correct Answer: Risk consequences

Note: This Question is unanswered, help us to find answer for this one

105. Which term refers to a project environment where project contributors do not report organizationally to a project manager?

Answer

Correct Answer: Matrix

Note: This Question is unanswered, help us to find answer for this one

106. Which are the most common parts of a stand-up meeting?

Answer

Correct Answer: Reporting the progress on the project since the last meeting, reporting of plans until the next meeting, noting issues that are delaying progress

Note: This Question is unanswered, help us to find answer for this one

107. What is the process of administering actionable tasks called?

Answer

Correct Answer: Delegation

Note: This Question is unanswered, help us to find answer for this one

108. Which is a formal approved document that defines how a project is executed, monitored and controlled and closed?

Answer

Correct Answer: Project Management Plan

Note: This Question is unanswered, help us to find answer for this one

109. In which phase is the Project Manager for a project identified?

Answer

Correct Answer: Project initiation

Note: This Question is unanswered, help us to find answer for this one

110. Which of the following is NOT an interpersonal skill a project manager should use when managing stakeholders expectations?

Answer

Correct Answer: Managing change requests

Note: This Question is unanswered, help us to find answer for this one

111. A stakeholder has been made aware of an overbudgeted, overstaffed, and underperformed project. How should the Project Manager respond?

Answer

Correct Answer: Identifying the details and environment surrounding the issues and enacting a post-assessment plan

Note: This Question is unanswered, help us to find answer for this one

112. Which type of chart displays the project start and finish dates?

Answer

Correct Answer: Gannt

Note: This Question is unanswered, help us to find answer for this one

113. For which task should a WBS be used?

Answer

Correct Answer: Identifying activities needed to create deliverables

Note: This Question is unanswered, help us to find answer for this one

114. This plan documents the approach to communicating effectively and efficiently with stakeholders.

Answer

Correct Answer: Communications Management Plan

Note: This Question is unanswered, help us to find answer for this one

115. Which of the following may be a result of failed deadlines?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

116. Which of the following should the project manager create to ensure that all work is included in the project plan?

Answer

Correct Answer: WBS

Note: This Question is unanswered, help us to find answer for this one

117. Which is a technique used to determine whether particular work can be accomplished by the project team or must be purchased from an outside source?

Answer

Correct Answer: Make-or-buy analysis

Note: This Question is unanswered, help us to find answer for this one

118. Which of the following constitutes one of the major areas of cost growth?

Answer

Correct Answer: Scope change

Note: This Question is unanswered, help us to find answer for this one

119. A client has added tasks to a contracted project without full disclosure. What is this called?

Answer

Correct Answer: Scope Creep

Note: This Question is unanswered, help us to find answer for this one

120. If you believe the likelihood of a milestone occurring is sufficient, you should list this probability as an:

Answer

Correct Answer: assumption.

Note: This Question is unanswered, help us to find answer for this one

121. Which type of project management is typically used in technology and software development?

Answer

Correct Answer: Agile project management

Note: This Question is unanswered, help us to find answer for this one

122. This action reduces the probability and/or impact of an adverse risk event to below an acceptable level.

Answer

Correct Answer: Risk mitigation

Note: This Question is unanswered, help us to find answer for this one

123. Which of the following handles Customer Requirement Documentation?

Answer

Correct Answer: Business analysis team

Note: This Question is unanswered, help us to find answer for this one

124. Which of the following should oversee the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information??

Answer

Correct Answer: Project Communications Management

Note: This Question is unanswered, help us to find answer for this one

125. Which would be the least effective course of action if several activities have taken longer than expected?

Answer

Correct Answer: Hope that later activities will make up for the loss of time

Note: This Question is unanswered, help us to find answer for this one

126. The project closes with:

Answer

Correct Answer: project review.

Note: This Question is unanswered, help us to find answer for this one

127. Project Governance involves:

Answer

Correct Answer: sharing practices with team and assigning roles in monitoring.

Note: This Question is unanswered, help us to find answer for this one

128. Which must a project manager complete to create clear boundaries for project completion?

Answer

Correct Answer: Scope statement

Note: This Question is unanswered, help us to find answer for this one

129. Which of the following is part of the process of Project Review?

Answer

Correct Answer: Monitoring project performance and control of risks

Note: This Question is unanswered, help us to find answer for this one

130. What does a Project Lifecycle consist of?

Answer

Correct Answer: A logical sequence of project phases comprising of associated activities

Note: This Question is unanswered, help us to find answer for this one

131. Which of the following is Cost Variance used to monitor?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

132. Which is the key attribute of a kickoff meeting?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

133. For which task is the Project Manager responsible?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

134. Which of the following is the project manager responsible for?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

135. What steps is the Project Closure phase comprised of?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

136. What is the prime role of a Project Manager?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

137. Who are the stakeholders of a project?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

138. Which of the following consists of all the processes that ensure that only the work absolutely necessary to successfully complete the project has been defined?

Answer

Correct Answer: Project Scope Management

Note: This Question is unanswered, help us to find answer for this one

139. Who is responsible for code testing?

Answer

Correct Answer: Both the coder and tester

Note: This Question is unanswered, help us to find answer for this one

140. Four components of Eisenhower Matrix are:

Answer

Correct Answer: B-Tasks, A-Tasks, Tasks for Dustbin, C-Tasks

Note: This Question is unanswered, help us to find answer for this one

141. The focus on what outcomes should change in project management is the:

Answer

Correct Answer: Benefits realisation management

Note: This Question is unanswered, help us to find answer for this one

142. What project management graphic shows you progress in terms of schedule, earned value and cost versus budget?

Answer

Correct Answer: S-curve

Note: This Question is unanswered, help us to find answer for this one

143. ______ is action taken to ensure that a defective or nonconforming item complies with requirements or specifications

Answer

Correct Answer: Rework

Note: This Question is unanswered, help us to find answer for this one

144. _______ is the total planned value for the project and constitutes the cost performance baseline.

Answer

Correct Answer: Budget at Completion (BAC)

Note: This Question is unanswered, help us to find answer for this one

145. What types of project change qualify for change management?

Answer

Correct Answer: Change of team members.

Note: This Question is unanswered, help us to find answer for this one

146. You have prepared the plan, received sign-off from the team, and are just about to get client sign-off. Which project phase are you in?

Answer

Correct Answer: Project planning

Note: This Question is unanswered, help us to find answer for this one

147. Which of the following is NOT an input in the project management plan process?

Answer

Correct Answer: Change Management Plan

Note: This Question is unanswered, help us to find answer for this one

148. You have one client, a technical resource, a design resource, an advisor, and yourself on a project. How many paths of two way communications are there to manage if all of them have complete access to each other?

Answer

Correct Answer: 10

Note: This Question is unanswered, help us to find answer for this one

149. Which of the following is NOT a process in project time management?

Answer

Correct Answer: Review schedule

Note: This Question is unanswered, help us to find answer for this one

150. Which of these IS a valid earned value rule?

Answer

Correct Answer: 25/75

Note: This Question is unanswered, help us to find answer for this one

151. What purpose does an OBS serve?

Answer

Correct Answer: Organizes project stakeholders within the context of a project.

Note: This Question is unanswered, help us to find answer for this one

152. How many phases are there in a common phase-gate model?

Answer

Correct Answer: 6

Note: This Question is unanswered, help us to find answer for this one

153. The act of gathering and organizing resources to accomplish a goal is called what?

Answer

Correct Answer: Management

Note: This Question is unanswered, help us to find answer for this one

154. Which of the following is NOT a process in Project Communications Management?

Answer

Correct Answer: Manage project team expectations

Note: This Question is unanswered, help us to find answer for this one

155. Projectized refers to what?

Answer

Correct Answer: An organizational structure where the team members report directly to a project manager.

Note: This Question is unanswered, help us to find answer for this one

156. Which of the following would NOT be suitable for project management?

Answer

Correct Answer: The management of a telephone call centre

Note: This Question is unanswered, help us to find answer for this one

157. If you want to evaluate how much work effort remains on the project, what measure are you most likely to use?

Answer

Correct Answer: ETC

Note: This Question is unanswered, help us to find answer for this one

158. Which of the following is NOT a critical practice for a software project?

Answer

Correct Answer: Customer management

Note: This Question is unanswered, help us to find answer for this one

159. In what stage of team development do the members of the project team begin to trust each other?

Answer

Correct Answer: Norming

Note: This Question is unanswered, help us to find answer for this one

160. Generally, in what project phase is risk and opportunity greater than the amount at stake?

Answer

Correct Answer: Planning phase

Note: This Question is unanswered, help us to find answer for this one

161. Alarmed by lagging progress, a project manager chooses to crash the schedule. What is s/he doing?

Answer

Correct Answer: Adding additional resources to decrease the duration of future activities.

Note: This Question is unanswered, help us to find answer for this one

162. Project closes with:

Answer

Correct Answer: Project review

Note: This Question is unanswered, help us to find answer for this one

163. ______ is the degree to which a set of characteristics fulfills requirements.

Answer

Correct Answer: Quality

Note: This Question is unanswered, help us to find answer for this one

164. ________ is a provision, usually time or money, to mitigate cost and/or schedule risk.

Answer

Correct Answer: Reserve

Note: This Question is unanswered, help us to find answer for this one

165. What is a WBS input?

Answer

Correct Answer: Items needed before an activity can be done.

Note: This Question is unanswered, help us to find answer for this one

166. A project management team has subcontracted work to a service company. Which of the following tools is the best choice to assure that this company will be able to meet the quality requirements of the project?

Answer

Correct Answer: Quality audit

Note: This Question is unanswered, help us to find answer for this one

167. What is the origin of the traditional project management's nickname "Waterfall?"

Answer

Correct Answer: The look of project activities scheduled back to back on a Gantt chart.

Note: This Question is unanswered, help us to find answer for this one

168. What is the main responsibility of the Steering Committe during Project Execution?

Answer

Correct Answer: Making clear and timely decisions

Note: This Question is unanswered, help us to find answer for this one

169. A burndown chart is used for which of the following purposes?

Answer

Correct Answer: To visualize schedule progress.

Note: This Question is unanswered, help us to find answer for this one

170. Which of the following is NOT a cost estimate tool or technique?

Answer

Correct Answer: Delphi method

Note: This Question is unanswered, help us to find answer for this one

171. Which one of the following is NOT in Maslow's hierarchy of needs?

Answer

Correct Answer: Self Performance

Note: This Question is unanswered, help us to find answer for this one

172. What project document is best used to document initial roles, scope, and expectations?

Answer

Correct Answer: Project charter

Note: This Question is unanswered, help us to find answer for this one

173. What is scope creep?

Answer

Correct Answer: Features and deliverables not agreed to in the original plan.

Note: This Question is unanswered, help us to find answer for this one

174. Which of the following is NOT an example of a cost of quality?

Answer

Correct Answer: Gold-plating

Note: This Question is unanswered, help us to find answer for this one

175. What is the purpose of the process to collect requirements?

Answer

Correct Answer: To define and document stakeholders' needs to meet the project objectives.

Note: This Question is unanswered, help us to find answer for this one

176. Sometimes there is a waiting period between two sequential tasks. What is this span of empty time called?

Answer

Correct Answer: Float

Note: This Question is unanswered, help us to find answer for this one

177. Which of the following is NOT a process in Project Procurement Management?

Answer

Correct Answer: Retain procurements

Note: This Question is unanswered, help us to find answer for this one

178. What are the most common attributes in a risk register?

Answer

Correct Answer: Probability, impact

Note: This Question is unanswered, help us to find answer for this one

179. Customer Requirement Documentation is done by the:

Answer

Correct Answer: Business analysis team

Note: This Question is unanswered, help us to find answer for this one

180. _______ authorizes a project or phase of a project.

Answer

Correct Answer: Project Charter

Note: This Question is unanswered, help us to find answer for this one

181. You are assembling a team and building understanding of the project needs. Which project phase are you in?

Answer

Correct Answer: Project initiation

Note: This Question is unanswered, help us to find answer for this one

182. Which of the following is NOT a commonly used tool or technique to collect requirements?

Answer

Correct Answer: Review Project Plan

Note: This Question is unanswered, help us to find answer for this one

183. What term refers to a project environment where project contributors do not report organizationally to a project manager?

Answer

Correct Answer: Matrix

Note: This Question is unanswered, help us to find answer for this one

184. You notice that several activities have taken longer than expected. What would be the least effective course of action?

Answer

Correct Answer: Hope that later activities will make up for the loss of time.

Note: This Question is unanswered, help us to find answer for this one

185. Which of the following aspects of a project are known as the project management triangle?

Answer

Correct Answer: Scope, schedule, cost

Note: This Question is unanswered, help us to find answer for this one

186. ________ is reducing the probability and/or impact of an adverse risk event to below an acceptable level.

Answer

Correct Answer: Risk mitigation

Note: This Question is unanswered, help us to find answer for this one

187. _______ is giving the customer more than what was required.

Answer

Correct Answer: Gold-plating

Note: This Question is unanswered, help us to find answer for this one

188. _______ is the formal process to review, approve, and manage changes to project deliverables, documents, and the project management plan throughout the project.

Answer

Correct Answer: Integrated Change Control

Note: This Question is unanswered, help us to find answer for this one

189. ________ a technique used to determine whether particular work can be accomplished by the project team or must be purchased from an outside source.

Answer

Correct Answer: Make-or-buy analysis

Note: This Question is unanswered, help us to find answer for this one

190. ________ is the effect on project objectives if the risk event occurs.

Answer

Correct Answer: Risk consequences

Note: This Question is unanswered, help us to find answer for this one

191. Which of the following is not a common communication tool for project managers?

Answer

Correct Answer: Code register

Note: This Question is unanswered, help us to find answer for this one

192. Customer Requirement is captured during:

Answer

Correct Answer: Project initiation phase

Note: This Question is unanswered, help us to find answer for this one

193. A client has added tasks to a contracted project without full disclosure. This is called?

Answer

Correct Answer: Scope Creep

Note: This Question is unanswered, help us to find answer for this one

194. Which of these is the first phase of Project management?

Answer

Correct Answer: Initiation

Note: This Question is unanswered, help us to find answer for this one

195. ________ constitutes one of the major areas of cost growth.

Answer

Correct Answer: Scope change

Note: This Question is unanswered, help us to find answer for this one

196. If you believe the likelihood of a milestone occurring is sufficient, you could list this probability as what?

Answer

Correct Answer: Assumption

Note: This Question is unanswered, help us to find answer for this one

197. You are monitoring the schedule progress and evaluating budget. You see a trend of going over budget and are having conversations to correct the issue. Which project phase are you in?

Answer

Correct Answer: Project control

Note: This Question is unanswered, help us to find answer for this one

198. Quantitative Project Management is best used for?

Answer

Correct Answer: Predicting Cost and Schedule Overruns

Note: This Question is unanswered, help us to find answer for this one

199. Which of the following is NOT a source selection criteria used in contract procurement?

Answer

Correct Answer: open change requests

Note: This Question is unanswered, help us to find answer for this one

200. The team just discovered an significant unplanned cost. Which of the following is not a way to resolve this?

Answer

Correct Answer: Proceed with the project and hope that things sort out.

Note: This Question is unanswered, help us to find answer for this one

201. _______ is the expected total cost of the project at completion.

Answer

Correct Answer: Estimated Cost at Completion (EAC)

Note: This Question is unanswered, help us to find answer for this one

202. Which of the following is NOT one of the indicators of a team's effectiveness?

Answer

Correct Answer: Individual team members try to outperform one another.

Note: This Question is unanswered, help us to find answer for this one

203. Which of the following is NOT a feature of an issues log?

Answer

Correct Answer: The project team member that caused the issue is identified

Note: This Question is unanswered, help us to find answer for this one

204. With a little time to create a team, a Project Manager should value ________.

Answer

Correct Answer: Availability & Skill Set

Note: This Question is unanswered, help us to find answer for this one

205. The process of administering actionable tasks is called?

Answer

Correct Answer: Delegation

Note: This Question is unanswered, help us to find answer for this one

206. The _________ calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer.

Answer

Correct Answer: Critical path method

Note: This Question is unanswered, help us to find answer for this one

207. _______ consists of all the processes that ensure that the work necessary, and only the work necessary, to successfully complete the project has been defined.

Answer

Correct Answer: Project Scope Management

Note: This Question is unanswered, help us to find answer for this one

208. Which one of the following is NOT one of the four P's that effective software project management focuses on?

Answer

Correct Answer: Perspective

Note: This Question is unanswered, help us to find answer for this one

209. Which is NOT included in the 7 keys to success proposed by IBM?

Answer

Correct Answer: Complex tasks are postponed

Note: This Question is unanswered, help us to find answer for this one

210. ________ is acknowledging a risk but taking no action to avoid, transfer, or mitigate it.

Answer

Correct Answer: Risk acceptance

Note: This Question is unanswered, help us to find answer for this one

211. _______ is the processes and activities that determine quality policies, objectives, and responsibilities which ensure that the project will satisfy the needs for which it was undertaken.

Answer

Correct Answer: Project Quality Management

Note: This Question is unanswered, help us to find answer for this one

212. What is involved with fast tracking a schedule?

Answer

Correct Answer: Arranging some project activities to happen concurrently, rather than sequentially.

Note: This Question is unanswered, help us to find answer for this one

213. Add this type of clause to a deadline agreement for a project with great scope?

Answer

Correct Answer: Extension Clause

Note: This Question is unanswered, help us to find answer for this one

214. What are the most common parts of a stand-up meeting?

Answer

Correct Answer: Reporting the progress on the project since the last meeting, reporting of plans until the next meeting, noting issues that are delaying progress.

Note: This Question is unanswered, help us to find answer for this one

215. The team is working on the project and regular communication is happening between the project manager, the team, and the client. Which project phase are you in?

Answer

Correct Answer: Project execution

Note: This Question is unanswered, help us to find answer for this one

216. When is a WBS used?

Answer

Correct Answer: When identifying activities needed to create deliverables.

Note: This Question is unanswered, help us to find answer for this one

217. The _________ documents the approach to communicate effectively and efficiently with stakeholders.

Answer

Correct Answer: Communications Management Plan

Note: This Question is unanswered, help us to find answer for this one

218. A stakeholder has been made aware of an overbudgeted, overstaffed, and underperformed project. A Project Manager should respond by_________.

Answer

Correct Answer: Identifying the details and environment surrounding the issues and enacting a post-assessment plan

Note: This Question is unanswered, help us to find answer for this one

219. This type of chart displays a project start and finish date?

Answer

Correct Answer: Gannt

Note: This Question is unanswered, help us to find answer for this one

220. What is a project manager called when using scrum methodologies?

Answer

Correct Answer: Scrum Master

Note: This Question is unanswered, help us to find answer for this one

221. High Severity Risk in a project:

Answer

Correct Answer: Impacts negatively on progress and success of project

Note: This Question is unanswered, help us to find answer for this one

222. What does SV stand for?

Answer

Correct Answer: Schedule Variance

Note: This Question is unanswered, help us to find answer for this one

223. A sponsor has requested a fixed budget and a fixed scope. What is the most effective way to plan?

Answer

Correct Answer: Clarify with the sponsor which project attribute is most important to them. Plan the project with that attribute fixed.

Note: This Question is unanswered, help us to find answer for this one

224. Who is responsible for conducting formal or informal assessments of the project team's performance?

Answer

Correct Answer: Project management team

Note: This Question is unanswered, help us to find answer for this one

225. Triple constraint of a project is:

Answer

Correct Answer: Scope, schedule, cost

Note: This Question is unanswered, help us to find answer for this one

226. An effective Project manager will cancel a failing project only after this process?

Answer

Correct Answer: Project Assessment

Note: This Question is unanswered, help us to find answer for this one

227. _______ is the processes involved in estimating, budgeting, and controlling costs so the project can be completed within the approved budget.

Answer

Correct Answer: Project Cost Management

Note: This Question is unanswered, help us to find answer for this one

228. Which of these is not a stage of Project Development?

Answer

Correct Answer: Interpolation

Note: This Question is unanswered, help us to find answer for this one

229. The quantity of time that will elapse from the start of an activity to its end is called what?

Answer

Correct Answer: Duration

Note: This Question is unanswered, help us to find answer for this one

230. A team leader's job is to ______ a group's collaborative work.

Answer

Correct Answer: Oversee

Note: This Question is unanswered, help us to find answer for this one

231. Project Governance is about:

Answer

Correct Answer: Sharing practices with team and assigning roles in monitoring

Note: This Question is unanswered, help us to find answer for this one

232. The deliverables have been signed off and teams have stopped working on the project. Which project phase are you in?

Answer

Correct Answer: Project closure

Note: This Question is unanswered, help us to find answer for this one

233. Which of the following is NOT an interpersonal skill a project manager should use in managing stakeholders expectations?

Answer

Correct Answer: Denying change requests

Note: This Question is unanswered, help us to find answer for this one

234. True or False? The closing stage consists of more than one type of closure?

Answer

Correct Answer: True

Note: This Question is unanswered, help us to find answer for this one

235. Project Manager for a project is identified during:

Answer

Correct Answer: Project Initiation

Note: This Question is unanswered, help us to find answer for this one

236. _______ is a formal approved document that defines how a project is executed, monitored and controlled, and closed.

Answer

Correct Answer: Project Management Plan

Note: This Question is unanswered, help us to find answer for this one

237. Project Review is a process of:

Answer

Correct Answer: Monitoring project performance and control of risks

Note: This Question is unanswered, help us to find answer for this one

238. Which groups are included as project stakeholders?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

239. When is the best time to close a project?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

240. Project Lifecycle is:

Answer

Correct Answer: A logical sequence of project phases comprising of associated activities

Note: This Question is unanswered, help us to find answer for this one

241. Initiation is used to identify which of the following?

Answer

Correct Answer: All of the Above

Note: This Question is unanswered, help us to find answer for this one

242. Quality Control can be monitored by creating these?

Answer

Correct Answer: All of the Above

Note: This Question is unanswered, help us to find answer for this one

243. The point of planning is to ______.

Answer

Correct Answer: Understand whats needs to be done

Note: This Question is unanswered, help us to find answer for this one

244. Tester's job is to:

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

245. Which of these is not a stage of Project management?

Answer

Correct Answer: Cleansing

Note: This Question is unanswered, help us to find answer for this one

246. More rework in a project means:

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

247. What would a project manager need to understand in order to properly sequence activities in a WBS?

Answer

Correct Answer: All of the above

Note: This Question is unanswered, help us to find answer for this one

248. What are the key attributes of a kickoff meeting?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

249. Prime role of a Project Manager is:

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

250. What is the project manager responsible to do?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

251. Project Closure comprises of :

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

252. Project Manager is responsible for:

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

253. The stakeholders of a project are the:

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

254. What would be included as part of the "Triple constraint."

Answer

Correct Answer: Scope, Schedule, or Budget

Note: This Question is unanswered, help us to find answer for this one

255. If customer requirements are not met:

Answer

Correct Answer: A project can't be treated as successful

Note: This Question is unanswered, help us to find answer for this one

256. Failed deadlines may result in which of the following?

Answer

Correct Answer: All of these

Note: This Question is unanswered, help us to find answer for this one

257. Project Plan primarily consists of:

Answer

Correct Answer: Project tasks, priority, allocated to, and target date

Note: This Question is unanswered, help us to find answer for this one

258. Code testing is the job of:

Answer

Correct Answer: Both coder and tester

Note: This Question is unanswered, help us to find answer for this one