Correct Answer: 2
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Mechanical Engineering Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Mechanical Engineering MCQ Questions
In a programmed evaluation and review technique, if the slack of an activity is negative, then what can be stated for the project completion?
__________ is the angle made by the face of the tool and the parallel plane to the base of the cutting tool.
What type of gear is used to transmit power at constant velocity ratio between two shafts the axes of which intersect at an angle?
Which technique is known as 'time phase of loading'.
The process of heating the metal to the plastic state followed by application of pressure to form the molten metal into desired shape is known as ________.
The ratio of the maximum deflections of a beam simply supported at its ends with an isolated central load and that of with a uniformly distributed load over its entire length, is
Forces are called concurrent when their lines of action meet in
Shear deflection of a cantilever of length L, cross sectional area A and shear modulus G, under a concentrated load W at its free end, is
If two forces acting at a joint are not along the straight line, then for the equilibrium of the joint
In the given below figure, the rivets with maximum stress, are: