Correct Answer: True
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Microsoft Project Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Microsoft Project MCQ Questions
How does Microsoft Project calculate the total work time of a summary task?
Breaking a project into phases and then further dividing into summary tasks and subtasks is called _________ scheduling.
How will a task appear on the Gantt chart when it is a successor of another task?
What is the best way of doing resource loading in a project having lot of dependencies?
How can you change the duration on a summary task?
You are troubleshooting a schedule on someone else's computer The schedule has 10,000 tasks. When a change is made to a task's duration on a Fixed Units task, the start and finish dates do not change. change highlighting does not appear, and the Gantt Chart bat does not update. What is the cause of this issue?
Which option is not available in the Report tab on the ribbon?
A project contains many elements. What is used to describe the sum of the work required?
You want to switch the scheduling mode for a project from scheduling from a start date to scheduling from a finish date. This action will change the default constraint from As Soon As Possible to As Late As Possible. Which dialog box should you use to make this change?
When setting the Calculate multiple critical paths option in a master project's Advanced settings, which statement is correct?