Correct Answer: Independent Variables
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Six Sigma Black Belt Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Six Sigma Black Belt MCQ Questions
Which of the following statements is NOT true regarding the short run set chart?
What does a control limit indicate?
Which of the following statements is false with respect to Gage R&R?
"Process ACME" involves the manufacturing of Smart boxes. In Process ACME, A,B,C & D are the opportunities for defects. In one such process, 20 defects were found in 100 smart boxes made. What is the six sigma level at which Process ACME is operating?
A manufacturer of bicycles would like to visualize where the defects occur on the bicycles. The defects encountered so far include missing bolts, paint peeling, missing decals, sharp edges, and bent metal parts. A useful tool for this application is a:
Why are variable control chart subgroup sizes generally 3, 4, 5, or 6? A: Larger subgroup sizes would permit an opportunity for process changes with the subgroup. B: They easily fit on traditional chart paper C: They are large enough so that averages of data will follow the normal distribution D: They permit a separation of within time from time-to-time variation
The objective of Design of Experiments (DOE) is to:
In an estimated Rolled Throughput Yield (RTY) equation, what is the Defects per Unit (DPU) threshold limit?
What does SIPOC stand for?
What first step should six sigma projects begin with?