Correct Answer: Find the right settings for key process input variables, to optimize process performance
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Six Sigma Black Belt Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Six Sigma Black Belt MCQ Questions
Why are variable control chart subgroup sizes generally 3, 4, 5, or 6? A: Larger subgroup sizes would permit an opportunity for process changes with the subgroup. B: They easily fit on traditional chart paper C: They are large enough so that averages of data will follow the normal distribution D: They permit a separation of within time from time-to-time variation
The mentor for a Green Belt exam should be at least be designated what?
TPM efforts attempt to minimize six big losses. Which of the following would NOT be included:
The proportion of units that go through a process for the first time without defect is called:
Excessive conflict within a work team: A: Has a positive effect on creating alternate solutions B: Most often results in lose-lose situations C: Has a negative effect on team members and should be avoided
Which of the following statements is NOT true regarding the short run set chart?
Which of the following sets of variables can be controlled to change performance in six sigma?
What information does Cp convey?
There is a 50% chance that a bike will be produced with a defect. This probability is called the:
When the Upper Specification Limit (USL) and Lower Specification Limit (LSL) for a Six Sigma Process are plotted on a Normal Distribution, they are located at: