Software Testing Quiz # 4

Instructions
Quiz: Software Testing Quiz # 4
Subject: Basic Software Testing
Total Questions: 30 MCQs
Time: 30 Minutes

Note

  • Do not refresh the page while taking the test.
  • Results along with correct answers will be shown at the end of the test.
Software Testing Quiz # 4
Question 1 of 30
00:00
  • Testing should be stopped when

  • Testing an object without execution on a computer is known as _____.

  • Which of the following is NOT a common resolution type for a defect?

  • Which of the following is a good way to grade a tester?

  • What is mutation testing?

  • True or false? All WC3 errors should be fixed to ship.

  • Running a system at high load for an extended period of time is called:

  • Stress testing hardware must be _____

  • A system includes a database server, a caching server, and an application server. How many integration points are there?

  • ______ is a method of testing where the software isn't used that checks the sanity of the code or algorithm.

  • RC1 stands for ______.

  • Test driven development (TDD) refers to what?

  • Executing the same test case by changing the input on the same build is called:

  • Which of the following is NOT a way stress may be placed on a piece of software?

  • What is the other name of All-Pairs Testing?

  • Who should perform validation testing?

  • Which of the following is NOT a reason to believe two test cases will produce the same result and fall in the same equivalence class?

  • ‘Be bugging’ is known as

  • When should the test environment setup be done?

  • Which of the following is a structure-based (white-box) technique?

  • Verification is:

  • An operator verifies that all production jobs are run. This is:

  • True or False? CAST stands for Computer-Aided Simple Testing?

  • Testing only the changes or modifications is called

  • Which of the following is NOT a form of dynamic testing?

  • A sports team plays 3 games a season. How many tests does a comprehensive test plan need to cover all the possible season results?

  • How stable is the ZBB build?

  • Power outage testing is part of ________.

  • Which of the following can inspections NOT find?

  • Resource hog tools are part of ________.

Liked this quiz? Share it with friends:

Software Testing Skill Assessment

Overall Skill Level-Poor

Your Skill Level: Poor

Retake Quizzes to improve it

Software Testing Skill Assessment

Overall Skill Level-Poor

Your Skill Level: Poor

Retake Quizzes to improve it