What is a successor activity?
A _________ is a deliverable oriented decomposition of a project into smaller components.
How many nested levels of sort criteria are available in the Sort dialog box?
A resource can be created by:
Which of the following is a valid task link type?
A project contains numerous linked tasks. What is the name for a task that is controlled or driven by another task(s)?
When you create a new blank project in Microsoft Project, what is the default view?
You want to manage multiple projects with one project designated as the master project. Which button on the ribbon do you use?
You are working with a master project that contains subprojects, and you want to see a list of tasks on which a subproject file is dependent. How can you do this in Microsoft Project?
You are working with two project files. You want the second project to contain some of the same tasks, along with their work assignments, as the first project. You Choose to copy the tasks between the projects. What else is copied along with the task when performing basic copy and paste action?