Correct Answer: Operational control
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Mathematics Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Mathematics MCQ Questions
_____ is the process of tracking system releases.
_____ means that a project can be implemented in an acceptable time frame.
_____ measure what an individual would miss by not having an information system or feature.
_____ reports contain special information not found in routine reports.
_____ results from overestimating one's own ability to influence actions and events.
if the arithmetic, geometric and harmonic means between two positive numbers are A, G and H, then which is correct
Which is NOT a purpose of Pascal's Triangle?
Consider a circular sector with angle θ = 45° and radius r = 16 meters. What is the arc length of the circular sector?
What is the equation of the horizontal asymptote of the function: f(x) = 3(x+3)(x-2)/(x+5)(x-1)
If a quadratic equation 2x^2+8x+4=0 has two roots a and b, then a+b=?