Correct Answer: 1/12th of the span
Explanation:
Note: This Question is unanswered, help us to find answer for this one
Civil Engineering Skill Assessment
Your Skill Level: Poor
Retake Quizzes to improve it
More Civil Engineering MCQ Questions
____________ is the ratio of the weight of the soil solids to the volume of the soil mass.
___________ is the distance between two adjacent trusses.
The soil which offers minimum resistance to the flow of electric current is known as _______.
The deformation of a hot brick when water falls on it is known as _______.
_____________ is the process of addition of a layer of cement mortar to the surface of concrete.
What does the Foundation Certification do?
What is required to be submitted to the County Assessor upon completion of the installation?
Which of the following is true about footing?
What does flashing prevent the passage of?
What is flashing installed to prevent?