Mechanical Engineering Quiz # 34

Instructions
Quiz: Mechanical Engineering Quiz # 34
Subject: Manufacturing Engineering Mechanical Engineering
Total Questions: 1465 MCQs
Time: 1465 Minutes

Note

  • Do not refresh the page while taking the test.
  • Results along with correct answers will be shown at the end of the test.
Mechanical Engineering Quiz # 34
Question 1 of 1465
00:00
  • What is the name of the method used to reduce waste during the manufacturing cycle?

  • What is the Standard Operating Procedure document used for?

  • What is the written record that documents and provides instruction for the steps included in a process or procedure?

  • What is another term for a statement of work?

  • What kind of performance is measured by the Total Effective Equipment Performance metric?

  • How is TEEP used to determine a production environment's potential?

  • What term is used by marketing and commercialization teams to describe the overall feedback from customers?

  • What is another name for the Voice of the Customer?

  • What type of customers experience is measured by VoC?

  • What does "shitsuke" mean?

  • What are the five Japanese words in the theory's name?

  • What does Wikipedia call an assembly line?

  • A manufacturing analytics platform can determine the availability of a machine by collecting and calculating what?

  • A BOM includes all the materials and parts needed to complete what?

  • What is an example use of a bill of materials?

  • What is the name of the document that contains all of the parts and materials needed to complete a product?

  • What is the term used when equipment is arranged in small increments?

  • What does the term cell represent in cellular manufacturing?

  • What does the CMM ensure are correct?

  • What tool ensures measurements are correct?

  • What type of product is affected by a CMM?

  • For example, it is used by ERP and MES systems for what?

  • What term is used in the manufacturing sector?

  • It is used by what systems for scheduling, purchasing, and production cost?

  • What is the amount of time a plant or particular cell or line is down, or off-line, and not producing any product?

  • How much downtime is there in the industrial world?

  • In a manufacturing environment, what are the products that have completed all stages of production?

  • What are finished goods in a manufacturing environment?

  • What does HMI stand for?

  • What is the term used to describe a system of interrelated smart devices?

Mechanical Engineering Skill Assessment

Overall Skill Level-Poor

Your Skill Level: Poor

Retake Quizzes to improve it

Mechanical Engineering Skill Assessment

Overall Skill Level-Poor

Your Skill Level: Poor

Retake Quizzes to improve it